12-253.1: PLANNED UNIT DEVELOPMENT APPLICATION REQUIREMENTS:
Application for a PUD shall be made with the Bonner County Planning Department. In addition to the basic information requirements and application forms provided by the department, a completed application shall include the following:
   A.   A report showing how the proposed PUD complies with the conditional use standards of section 12-223 of this chapter.
   B.   Environmental analysis, which shall address the impacts of the development on the various physical features of the land, including wetlands, wildlife habitat, vegetation, floodplain and floodways, cultural resources, water quality and other natural resources. (Ord. 501, 11-18-2008)
   C.   Reserved. (Ord. 583, 12-5-2018)
   D.   Preliminary development plan or conceptual land use plan for a "large scale" PUD of significant size which may be planned in phases for a variety of land use types over a period of time. The preliminary development plan contents for a "small scale" or "mixed use" PUD, or for any portion of an approved "large scale" PUD which is contemplated to be completed or under construction within two (2) years after approval, shall include the proposed use or uses, housing densities and arrangements, parking facilities, preliminary subdivision plan (if applicable), common areas, open spaces and a transportation network for vehicular and pedestrian circulation. The Planning Director or Governing Body may require drawings and sketches demonstrating the design characteristics and physical relationships of various uses and siting conditions in order to determine the feasibility and desirability of any necessary variation from the conventional development standards of this title.
   E.   A trip generation and distribution letter. (Ord. 501, 11-18-2008)