In addition thereto, and in order to ensure the proper maintenance of the streets of the village, a charge of $350 shall be required if the paved surface of any public street of the village is required to be cut or opened; provided, however that none of the above charges shall be levied in the event that such entry is ordered by the appropriate official or officials of the village. All street cuts made as hereinbefore contemplated shall have a saw cut edge or be cut with an air spade and trenches thus created shall be backfilled with wetted granular backfill material (304.02) in compacted layers not to exceed six inches. Granular fill shall be kept in a minimum of five inches below the finished grade with 404 asphaltic concrete and compacted to meet the finished grade.
(Ord. 32-96, passed 10-7-1996; Ord. 10-00, passed 6-26-2000; Ord. 06-08, passed 4-14-2008; Ord. 13-10, passed 6-14-2010; Ord. 06-11, passed 6-13-2011; Ord. 12-11, passed 7-25-2011)