(a) Discontinued operations. A
who has determined to discontinue operations in the
must either:
(1) Provide information satisfactory to the Director of Public Works that the
obligations for its
and
in the right-of-way under this Article IV have been lawfully assumed by another
; or
(2) Submit to the Director of Public Works an action plan for the removal or discontinuance of
and
. The
shall require removal of such
and
if the
determines such removal is necessary to protect the public health, safety and welfare. The
may require the
to submit a surety consisting of an irrevocable letter of credit or a cash deposit to be held in escrow in an amount sufficient to reimburse the
for reasonably anticipated costs to be incurred in removing the
and
.
(b)
. A
shall notify the
when
are to be discontinued. A
that has
in a right-of-way shall remove them from that right-of-way during the next scheduled
excavation if required in conjunction with other right-of-way repairs, excavation or construction, unless this requirement is waived by the
.
(Ord. 98-54, passed 11-16-1998; Ord. 2008-1, passed 1-14-2008)