The work to be done under the
and the
and
of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances beyond the control of the
or when work was prohibited as unseasonal or unreasonable. If the obstruction or excavation of the right-of-way begins later or ends sooner than the date given on the permit, the
must notify the
by a
of the accurate information as soon as the
knows this information.
(Ord. 98-54, passed 11-16-1998; Ord. 2006-32, passed 7-24-2006)