9-8-4: DISPLAY OF PERMITS:
The moving and right of way permits shall be securely attached to the front of the structure (as determined by direction of travel) before preparations for movement have been initiated. The permits shall remain attached to the structure until the building has arrived at its final destination. (Ord. 752, 3-10-1997)