12-2-5: FINAL CONSTRUCTION PLANS:
   A.   Requirements: Before any construction can begin, four (4) copies of the final proposed construction plans prepared by a licensed engineer, registered in the State, shall be submitted along with all other documents required by this title, to the City for review and approval. The plans shall reflect any corrections from the preliminary plat review. These construction plans shall include the final information (plans, profiles, details, etc.) concerning hydrology, hydraulics, topography, water distribution systems, wastewater systems, grading (existing and proposed), stormwater drainage systems, and paving which comply with the current Engineering Design Manual. (Ord. 854, 9-9-2002; amd. 2006 Code; Ord. 2026, 10-12-2009; Ord. 2217, 6-12-2017)
   B.   Review: The City will review the submitted information, returning the plans and documents to the subdivider as required for correction. The subdivider shall revise all plans and documents as required and resubmit to the City for review.
   C.   Permit Issuance: Upon approval of the construction plans and other documents by the City staff, a permit will be issued for construction.
   D.   Fees: The subdivider shall also pay all fees required by this title and City ordinances prior to the issuance of any construction permits.
   E.   PFPI; Security: Along with the final construction plans, the subdivider shall submit all required security and documents required. (Ord. 854, 9-9-2002; amd. Ord. 2026, 10-12-2009; Ord. 2217, 6-12-2017)