(A) In addition to inspection fees paid the village as provided for in § 51.06, prior to the start of constructing a proposed public water system or an extension to the existing system, the contractor of such construction shall have in his or her possession a permit issued by the county. A fee of $100 shall be charged for the permit. An additional fee shall be charged for water used during flushing and testing of the new water system. The amount shall be as determined by the County and shall be five times the volume of the new system times the current use rate with a minimum charge of $75.
(B) No person shall open or cause to be opened any fire hydrant without first securing a non-transferable “hydrant permit” at the county. The cost of said permit shall be a $50 security deposit plus an amount to be determined by an estimate of water to be used. The water use estimate shall have a minimum charge of $25. Such person must report to the county when such authorized use is terminated, at which time a hydrant inspection shall be made. Any costs of repairing the hydrants shall be deducted from the security deposit. The difference (if any) shall be refunded to the depositor. If the deposit is insufficient to cover said costs of repair the permit holder shall pay the deficit.
(O.C. § 2.24)