(A) All water systems proposed to be constructed in the village shall have engineering plans prepared by a registered professional engineer and shall be approved by the village and the county and a construction permit issued by the Michigan Department of Public Health.
(B) All construction of water systems shall have competent full-time inspection provided by or caused to be provided by the village.
(C) The cost of preparing engineering plans and the cost of providing inspection for the construction of a proposed water system shall be borne by the party causing said system to be constructed.
(D) All water systems located in the village shall be constructed in accordance with the standards and specifications of the village and the county.
(O.C. § 2.23)