§ 50.15 CONNECTIONS FOR SPRINKLER SYSTEMS.
   (A)   All irrigation systems shall have a separate tap from the water main and a separate meter. No irrigation system shall be connected in any manner to the house service. An RPZ device must be placed within 15 feet of the irrigation meter and before any branch lines. All RPZ devices shall be installed above ground with a minimum of 12 inches of unimpeded clearance from the bottom of the discharge port. All connections shall be made in accordance with specifications furnished by the Public Works Director.
   (B)   Any persons with irrigation connections who do not comply with the aforesaid requirements shall immediately bring the system into compliance.
   (C)   No water passing through connections made for irrigation purpose shall be used for any purposes other than to operate sprinkler system.
   (D)   In the event any person fails to comply with any of the provisions of this section, the town shall terminate water service to the irrigation connection until such time as the person is in compliance with this chapter.
   (E)   Any persons with an irrigation connection that does not comply with the aforesaid requirements in divisions (A) through (D) above, shall be given notice to conform thereto. A period of 14 days shall be allowed for the owner of the irrigation system to bring said system into compliance. After a period of 30 days of noncompliance, the water supply to the irrigation system shall be terminated until said system is brought into compliance.
(2013 Code, § 18.64)