(A) Utility easements. Easement for utilities shall be provided, preferably centered on rear or side lot lines and shall be at least ten feet in width.
(B) Drainage easements. An easement shall be reserved by the subdivider or otherwise provided conforming with the lines of any drainage way into which natural drainage has been diverted. Said drainage way shall be of sufficient width to carry stormwater runoff from a ten-year storm.
(C) Buffer strips. A buffer strip at least 20 feet in width may be required by the Board of Commissioners adjacent to a major street or a commercial development. This strip shall be reserved for the planting of trees and shrubs by the subdivider.
(Ord. passed 7-17-1984)