§ 152.062 MINING OF MATERIAL REQUIRING EXCAVATION FROM PITS OR POOLS.
   Provided, in addition to the requirements of § 152.061, that:
   (A)   A buffer strip of undisturbed land of sufficient width as determined by an engineer to prevent flood flows from channeling into the excavation is left between the edge of the channel and the edge of the excavation;
   (B)   The excavation meets all applicable laws and regulations of other local and state agencies; and
   (C)   Excavated material may be processed on site but is stockpiled outside the floodway.
(Ord. 484, passed 4-20-2015)
Statutory reference:
   Related provisions, see ARM § 36.15.602(1)(a), (1)(b), and (1)(c)