Skip to code content (skip section selection)
Compare to:
Sec. 50-26. Extension of water and wastewater mains.
   Where the extension of water and wastewater mains is required to serve properties which have been subdivided for development to include resale, the developer shall be responsible for the total cost of all on- and off-site mains of sufficient size to provide domestic or commercial, or industrial and/or fire protection in accordance with current standards. The city shall, at its option, require the developer to increase the size of the water and wastewater lines to meet anticipated growth, development and/or water and wastewater system general improvements. The city shall bear the additional expenses necessitated by the over sizing, only to the extent of actual cost of materials over and above the required sizes.
(Prior Code, § 16-2; Ord. of 1-24-1962; Ord. of 6-28-1983; Ord. of 9-22-1993)