A person who makes a pavement cut or excavation or places an embankment on a public street, alley, or sidewalk shall, as rapidly as practicable after a project is completed, backfill the excavation to a firm and solid bearing in a manner that will prevent the settling of the earth and shall restore the base and pavement surface as near as possible to its former condition. Restoration work must be completed to the satisfaction of the director.
(Ord. No. 033-2017, Exh. A(17-28.170), 8-22-2017)