The compressor station on each well existing within the city limits and on each well drilled pursuant to a permit under this section shall be equipped with an automatic shut-down device which shall be clearly marked and visible at all times. The compressor station and all pipes and valves connected thereto must meet or exceed the minimum internal pressure yield strength established under American Petroleum Institute standards and shall have prior to installation unconditionally passed a complete cold water test. All compressor stations shall be checked a minimum of once each three months and the result of said check shall be sent to the chief building inspector upon request. Failure to comply with this section shall result in immediate cancellation of the drilling permit issued hereunder.
(Prior Code, § 5-187; Ord. of 3-11-1980)