The POTW shall evaluate each significant industrial user at least once every two years, and other industrial users as necessary, to determine whether such user needs a plan to control slug discharges. If the POTW decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements:
(A) Description of discharge practices, including nonroutine batch discharges;
(B) Description of stored chemicals;
(D) If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site run-off, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response.
(Ord. 312-3-92, passed 3-16-92; Am. Ord. 493-05-02, passed 5-20-02)