§ 53.026 SPILL PREVENTION PLANS.
   The POTW shall evaluate each significant industrial user at least once every two years, and other industrial users as necessary, to determine whether such user needs a plan to control slug discharges. If the POTW decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements:
   (A)   Description of discharge practices, including nonroutine batch discharges;
   (B)   Description of stored chemicals;
   (C)   Procedures for immediately notifying the POTW of slug discharges, including any discharge that would violate a prohibition under §§ 53.015 and 53.016, with procedures for follow-up written notification within five days.
   (D)   If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site run-off, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response.
(Ord. 312-3-92, passed 3-16-92; Am. Ord. 493-05-02, passed 5-20-02)