§ 1400.12 Right-of-Way Patching and Restoration.
   Subd. 1.   Timing. The work to be done under the permit, and the patching and restoration of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances beyond the control of the permittee.
   Subd. 2.   Patch and Restoration. Permittee shall patch and restore his or her own work. The city may choose to restore the right-of-way itself if the work is not completed in accordance with the deadlines outlined in the permit.
         1.   City Restoration. If the city restores the right-of-way, permittee shall pay the costs thereof within 30 days of billing. If, following such restoration, the pavement settles due to permittee’s improper backfilling, the permittee shall pay to the city, within 30 days of billing, all costs associated with correcting the defective work.
         2.   Permittee Restoration. If the permittee restores the right-of-way itself, it shall, at the time of application for an excavation permit, post a construction performance bond in accordance with the provisions of Minn. Rules part 7819.3000, as it may be amended from time to time.
   Subd. 3.   Standards. The permittee shall perform excavation, backfilling, patching, and restoration according to the standards and with the materials specified by the city and shall comply with Minn. Rules part 7819.1100, as it may be amended from time to time.
   Subd. 4.   Duty to Correct Defects. The permittee shall correct defects in patching or restoration performed by permittee or his or her agents. The permittee, upon notification from the city, shall correct all restoration work to the extent necessary, using the method required by the city. Said work shall be completed within five calendar days of the receipt of the notice from the city, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonable or unreasonable.
   Subd. 5.   Failure to Restore. If the permittee fails to restore the right-of-way in the manner and to the condition required by the city, or fails to satisfactorily and timely complete all restoration required by the city, the city, at its option, may do such work. In that event the permittee shall pay to the city, within 30 days of billing, the cost of restoring the right-of-way. If permittee fails to pay as required, the city may exercise its rights under the construction performance bond.