§ 1107.07 Storm Water Management.
The developer shall submit a storm water management plan to the city and said plan shall comply with all federal, state, and local requirements. Storm water drainage facilities shall be designed to convey the flow of surface waters without damage to persons or property. The system shall ensure drainage at all points along streets, and provide positive drainage away from building and on-site waste disposal to accommodate frequent floods. Drainage plans shall be consistent with local and regional drainage plans. The facilities shall be designed to protect against surface erosion and siltation of surface water and to prevent the discharge of excess runoff onto adjacent properties. The natural drainage shall be used as far as is feasible for the storage and flow of runoff. Developer must comply with all federal, state, and local requirements including but not limited to the State Pollution Control Agency’s NPDES construction permit requirements, State Storm Water Manual, and Engineering Design Standards.