(A) A City of Bethany permit is required prior to moving a manufactured home into the City of Bethany.
(B) The manufactured home shall be constructed according to the rules of the United States Department of Housing and Urban Development.
(C) The manufactured home shall have a label issued by the Director to indicate compliance with the standards, rules, and regulations established by the United States Department of Housing and Urban Development; and the label is permanently attached to each transportable section of each HUD-code manufactured home.
(D) The Manufactured home shall have a construction date of no older than five years. Proof of construction date shall be provided to the City of Bethany Inspector during the permit process and before entrance into the City of Bethany.
(E) The manufactured home shall be built on a permanent chassis.
(F) The manufactured home shall be installed by a professional installer of manufactured homes.
(G) The manufactured home shall be installed on a temporary or permanent foundation system and the home shall be properly connected to the foundation by an anchoring system.
(H) Installation of the manufactured home shall include skirting at the bottom of the home to conceal the foundation system and piping system. The skirting shall conform to the definition referenced in § 152.01.
(Ord. 1974, passed 8-6-19)