   (A)   Class 1 Residential
      Service charge (minimum bill)         $12.00/monthly
      Energy charge (each kwh)            $0.0559
   (B)   Class 2 Commercial
      Service charge (minimum bill)         $15.00/monthly
      Energy charge (each kwh)            $0.0595
   (C)   Class 3 Large Commercial
      Minimum charge               $18.75/monthly
      Demand charge (each kwh)         $3.90
      Energy charge (each kwh)            $0.0485
   (D)   Class 4 Industrial and Large Commercial
      Minimum charge               $939.00/monthly
      Demand charge (each kwh)         $8.10
      Energy charge (each kwh)            $0.0485
   (E)   Class 5 Primary Metering Customer Owned/Leased Transformers
      Minimum charge               $900.00/monthly
      Demand charge (each kwh)         $7.85
      Energy charge (each kwh)            $0.0359
   (F)   Class 6 Primary Metering Non-Owned/Leased Transformers
      Demand charge (each kwh)         $7.15
      Energy charge (each kwh)            $0.0369
   (G)   Class 8 Private Outdoor Lighting Service
      Mercury vapor
         175 watt standard overhead      $7.05/monthly
         175 watt existing pole         $6.05/monthly
         400 watt existing pole         $9.50/monthly
      High pressure sodium
         70 watt standard overhead         $4.15/monthly
         70 watt existing pole         $3.15/monthly
         100 watt standard overhead      $5.10/monthly
         100 watt existing pole         $4.55/monthly
         250 watt standard overhead      $10.00/monthly
         250 watt existing pole         $9.35/monthly
   (H)   Class 9 Net Billing Service
      (1)   Applicability. In all territory served by Berea Municipal Utilities (BMU).
      (2)   Availability of service. Available to customers who lease or own, operate, and maintain a generation system located on customer’s premises that use as its total fuel source solar, wind or hydro energy, or fossil fuel in parallel with BMU’s written net metering notification form. The generations system shall be limited to a maximum capacity of ten kilowatts for residential customers and 60 kilowatts for non-residential customers. This service will be made available to BMU electric customers, not to exceed 1% of BMU peak system demand, who execute and submit a net metering application and notification form. The initial limit will be 360kW to be re-evaluated every three years.
      (3)   Application. The customer shall submit a completed net metering application form including generator sizing with schematic prior to construction. BMU will provide technical guidance and forms within application process.
      (4)   Notification. The customer shall submit a completed net metering notification form to BMU at least 30 days prior to the date the customer intends to interconnect his generator to BMU’s facilities. Customer shall have all equipment necessary to complete the interconnection installed prior to such notification. The company shall have 30 days from the date of notification to determine whether the customer has satisfied the section requirements and shall notify customer. The date of notification shall be the third day following the mailing of the net metering notification form by customer. Customer may interconnect his generator 31 days after the date of notification, and begin operation unless BMU provides notification of non-compliance to the section, prior to the thirty-first day.
      (5)   Metering and billing. Net metering service shall be measured in accordance with standard metering practices by metering equipment capable of measuring (but not necessarily displaying) power flow in both directions. If electricity generated by the customer and fed back to BMU’s system exceeds the electricity supplied to the customer for the system during a net metering period, the customer shall receive no compensation from BMU unless the customer has entered into a purchase power contract with BMU. If electricity generated by the customer and fed back the system exceeds the electricity supplied to the customer from the system during any monthly billing period, resulting in a billing period credit, the customer shall be required to pay only the non-energy charged for that billing period. Any excess net generation by the customer shall be accumulated, carried forward and applied at the first opportunity to any monthly billing periods having a positive net consumption. Any accumulated billing period credits remaining unused at the end of a monthly net metering period shall be carried forward into the next monthly net metering period for a 12 month period when all credits will expire and zero out. Net metering service shall be measured using a single meter or, as determined by BMU, additional meters.
      (6)   Rates. 
         (a)   For customers with rated generating capacity not exceeding ten (10) kilowatts, net energy usage shall be billed at currently kWh residential rates.
         (b)   For customers with rates generating capacity exceeding ten (10) kilowatts, net energy usage shall be billed at avoided cost or wholesale kWh currently charged by KU to BMU.
      (7)   Liability insurance. A customer with a generator with a rated capacity not exceeding ten (10) kilowatts shall maintain homeowners, commercial, or other insurance providing coverage in the amount of at least $100,000 for the liability of the insured against loss arising out of the use of a generator, and for a generator with a rated capacity exceeding ten (10) kilowatts such coverage shall be in the amount of at least $300,000.
      (8)   Additional controls and tests. BMU may install additional controls of meter, or conduct additional test as it may deem necessary.
      (9)   Net metering service interconnection guidelines. Customer shall operate the generating facilities in parallel with BMU’s system under the following conditions and any other conditions required by BMU where unsual conditions arise not covered herein:
         (a)   Customer to own, install, and maintain all generating facilities on their premises. Such facilities shall include, but not be limited to, necessary control equipment to synchronize frequency, voltage, etc., between customer’s and BMU’s system as well as adequate protective equipment between the two systems. Customer’s voltage at the point of interconnection will be the same as BMU’s system voltage.
         (b)   Customer will be responsible for operating generators and all facilities owned by customer except as specified hereinafter. Customer will maintain its system in synchronization with BMU’s system. Customer’s equipment must be located in a BMU approved location and may not interfere with the operation, maintenance and access of BMU equipment.
         (c)   Customer will be responsible for any damage done to BMU’s equipment due to failure of customer’s control, safety, or other equipment.
         (d)   BMU, at its discretion, may require a suitable lockable, BMU accessible, load breaking manual disconnect switch or similar equipment, as specified by BMU, to be furnished by customer at a location designated by BMU to enable the separation or disconnection of the two electrical systems. The load breaking manual disconnect switch must be accessible to BMU at all times.
         (e)   Customer agrees to inform BMU of any changes it wishes to make in its generating and/or associated facilities that is different from those initially installed and described to BMU in writing and obtain prior approval from BMU.
         (f)   BMU will have the right to inspect and approve customer’s facilities, described herein, and conduct any tests necessary to determine that such facilities are installed and operating properly. However, BMU will have no obligation to inspect, witness tests or in any manner be responsible for customer’s facilities or operation.
         (g)   The customer assumes all responsibility for the electric service on the customer’s premises at and from the point of delivery of electricity from BMU and for the wires and equipment used in connection therewith, and will protect and save BMU harmless from all claims for injury or damage to persons or property occurring on the customer’s premises or at and from the point of delivery of electricity from BMU, occasioned by such electricity or said wires and equipment, except where said injury or damage will be shown to have been occasioned solely by the negligence of BMU.
      (10)   Conditions of interconnection. A customer may begin operation of his generator on an interconnected basis when all of the following have been satisfied:
         (a)   The customer has properly notified Berea municipal utilities (BMU) of his intent to interconnect by submission of the completed net metering notification form.
         (b)   The net metering customer has installed a lockable, BMU accessible, load-breaking manual disconnect switch, if required.
         (c)   A licensed electrician has certified, by signing the net metering notification form, that any required manual disconnect switch has been installed properly and that the generator has been installed in accordance with the manufacturer’s specifications as well as all applicable provisions of the National Electrical Code.
         (d)   The vendor has certified, by signing the net metering notification form, that the generator being installed is in compliance with the requirements established by underwriters laboratories, or other national testing laboratories.
         (e)   The customer has had the inverter settings inspected by BMU, if the generator is a static inverter-connected generator with an alternating current capacity in excess of ten (10) kilowatts. BMU may impose a fee on the customer for such inspection, which will be actual cost not exceeding $50.00 per inspection.
      (11)   Definitions. The following definitions shall apply to this subchapter as written unless context indicates or requires a different meaning.
         “BILLING PERIOD.” The time period between the dates on which Berea municipal utilities issued the customer’s bills.
         “BILLING PERIOD CREDIT.” The electricity generated by the customer that flows into the electric system and which exceed s the electricity supplied to the customer for the electric system and which exceeds the electricity supplied to the customer for the electric system during any billing period.
         “NET METERING PERIOD.” Each successive twelve (12)-month period beginning with the first meter reading date following the date and final interconnection of the generator with the Berea municipal utilities facilities.
      (12)   Rules and regulations. Except as provided herein, service will be provided under Berea municipal utilities’ rules and regulations or terms and conditions.
   (I)   All classes
      (1)   Late payment charge: 10% will be added if bill is not paid by the 10th day after billing date; provided that the one-time waiver of delinquent utility bills specified in § 31.105 shall also apply to electric bill delinquencies.
      (2)   Reconnect charges: $20.00.
      (3)   Discontinuance of service for non-payment: If the account is not paid by the 20th day after the date of mailing of the monthly bill, service may be discontinued in accordance with the rules and regulations of the Berea Municipal Electric Utility.
      (4)   Additional charges: There shall be added to the bill of each customer as a separate item:
         (a)   A franchise replacement fee equal to 3% of the gross bill for the water service provided, pursuant to Ordinance No. 16-04; and
         (b)   An amount equal to the proportionate share of any license, franchise or similar fee or tax now or hereafter imposed upon the Berea Municipal Electric Utility by any governmental body or entity, including but not limited to Berea Independent School District or the Madison County School District, or the Kentucky River Authority or similar administrative or governmental body.
      (5)   Revenue stabilization adjustment: A monthly adjustment, which may either be a charge or credit, shall be applied for the purpose of providing for the difference between Berea’s budgeted cost of service and projected revenues for the current fiscal year. Cost of service shall include operation and maintenance expenses, interest and principal on debt, average extensions and replacements, and margins. The adjustment shall be determined prior to the beginning of each fiscal year and remain in effect for the entire fiscal year. For customers taking service under Residential Service - Class 1, Small Commercial - Class 2, Large Commercial - Class 3, Industrial and Large Commercial - Class 4, Industrial and Large Commercial - Class 5, Industrial and Large Commercial - Class 6, and Net Billing Service - Class 9, the revenue stabilization adjustment shall be applied as charge or credit to the customer service charges or minimum charges. For customers taking service under Private Outdoor Lighting - Class 8, the revenue stabilization adjustment shall be applied as a charge or credit per light per month.
      (6)   Changes in wholesale energy costs. All increases or decreases in the cost of electric power by the Municipal Utility’s wholesale energy provider shall be applied as a charge or credit per KW and/or KWh.
      (7)   Penalty fee for tampering with metering device: In the event a customer, or anyone on the customer’s behalf, reconnects service or otherwise tampers with the service connection or metering device after service is terminated for non-payment, then (a) BMU is authorized to disconnect the service and/or remedy the tampered with service connection or metering device, and (b) the customer shall be assessed a penalty fee of $500.00, in addition to any reconnect charges, to be added to the customer’s bill of account at BMU, and BMU shall not provide service to the customer until the full amount of the customer’s account, including any penalty fee and overdue service payment, is paid and satisfied in full.