All residential applications/permits are subject to a plan review.
Planning Committee Suggested
|
Planning Committee Suggested
| |
BUILDING | |
New dwelling | $0.35 per sq. ft. $1,050 min. |
Addition | $0.35 per sq. ft. $200 min. |
Alteration | $0.30 per sq. ft. $100 min. |
Demolition | $50 |
Accessory structure (over 200 sq. ft.) | $0.30 per sq. ft. $100 min. |
Retaining wall | $50 + engineer review fee |
Deck/patio | $100 |
In ground swimming pool/tennis court | $400 |
Re-inspection | $50 |
Waterproofing | $50 |
Contractor registration | $75 |
Plan review | $125 per hour |
ELECTRICAL | |
Base fee | $50 |
New dwelling | Each item, $300 min. |
Addition | Each item, $100 min. |
Alteration | Each item, $75 min. |
Accessory structure | Each item, $75 min. |
Temporary power pole | $50 |
Electric service (under 200 amp) | $50 |
Electric service (over 200 amp) | $75 |
Sub panel | $50 |
120 volt duplex outlets, switches & lighting fixtures | $2 |
220 volt power outlets. (A/C unit, dryer, range, etc.) | $10 |
Electric baseboard heat, per unit | $10 |
Generator | $100 |
Lightning grounding system | $50 |
Electric furnace/heat pump (inside unit) | $50 |
Electric to septic | $50 |
Re-inspection | $50 |
Plan review fee | $125 per hour |
Contractor registration | $75 |
HVAC | |
Basic fee | $0 |
New dwelling | Each item, $300 min. |
Addition | Each item, $100 min. |
Alteration | Each item, $75 min. |
Accessory structure | Each item, $75 min. |
Furnace (new or replacement) | $50 |
A/C (new or replacement) | $50 |
Heat duct extension | $35 |
Unit equipment - each system, (roof fans, bath fans, etc.) | $10 |
Fuel gas piping, per outlet | $10 per outlet |
Hydronic/hot water or steam - each system (new or replacement) | $50 |
Hydronic/hot water or steam extension | $35 |
Re-inspection fee | $50 |
Plan review fee | $125 per hour |
Contractor registration | $75 |
PLUMBING | |
Base fee | $0 |
New dwelling | Each item, $300 min. |
Addition | Each item, $100 min. |
Alteration | Each item, $75 min. |
Accessory structure | Each item, $75 min. |
Fixtures/drains | $35 |
Hot water tank (new or replacement) | $50 |
Fuel gas piping, per outlet | $10 per outlet |
Lawn irrigation system | $50 |
Main water line | $50 |
Sewage ejector pump | $50 |
Contractor registration | $75 |
Re-inspection fee | $50 |
Plan review | $125 per hour |
MISCELLANEOUS FEES/ZONING FEES | |
Base zoning permit fee | x |
Driveway apron (new or replacement) | $75 |
Driveway (new or replacement) | $75 |
Fences (up to 100 linear feet) | $75 |
Fences (over 100 linear feet) | $100 |
Construction dumpster | $50 |
Sidewalk (new or replacement) | $50 |
Flag pole | n/c |
Street opening permit (same side street) | $100 + $1,000 deposit |
Street opening permit (across street) | $100 + $2,500 deposit |
Engineering deposit (new dwelling) | $750 (see Section 1274.04) |
Engineering deposit (addition) | $750 (see Section 1274.04) |
Engineering deposit (shed, deck, garage) | $750 (see Section 1274.04) |
Road use fee | Eliminate |
Cisterns | $100 |
Rain barrel (per barrel) | $10 |
Fireplace/chimney | $100 |
Miscellaneous: all items that do not fit in a category above | $50 |
(Ord. 2014-16. Passed 6-18-14.)