(A) No house or building shall be moved within the corporate limits until a permit has been obtained therefor. The Building Inspector shall not issue a permit if, in his judgment, the proposed new location of the building would seriously increase fire hazards to surrounding buildings. A fee of $150 shall be charged for the permit. ( S.C. Code § 5-25-330) (‘88 Code, § 5.104)
(B) For the demolition of any building or structure, the fee shall be $150. (‘88 Code, § 5.119)
(Am. Ord. 09-11-01, passed 11-17-09) Penalty, see § 10.99