§ 56.61 PRETREATMENT PROGRAM SURVEILLANCE.
   Annual inspection and sampling. The authority will conduct at a minimum annually, overall compliance inspections of all significant industrial users. The inspection will include a review of the following requirements:
   (A) Sampling and analysis of effluent discharges;
   (B) Record keeping;
   (C)   All chemical inventories of raw materials or chemicals stored onsite;
   (D)   Evaluation of production operations;
   (E)   Evaluation of pretreatment facilities:
      (1) Operation;
      (2) Design;
      (3) Maintenance;
      (4) Sampling methods;
      (5) Analytical techniques;
      (6)   Flow measurement; and
      (7)   Any other area designated by the control authority.
(Ord. 16-04-001, passed 4-19-16)