§ 152.18 RUNOFF VOLUMES AND RATES.
   (A)    In the selection of a drainage plan for a development, the applicant shall choose a strategy which strives to minimize the increase in runoff volumes and rates from the site.
   (B)   The applicant shall observe the following hierarchy in developing a drainage plan:
      (1)   Minimization of impervious surfaces on the property;
      (2)   Flow attenuation by use of open vegetated swales and retention of natural depressions or construction of new ones in conjunction with retention of existing natural stream channels;
      (3)   Infiltration of runoff on-site;
      (4)   Stormwater retention structures;
      (5)   Stormwater detention structures;
      (6)   Storm sewers.
   (C)   At all times, the applicant shall keep in mind ground water quality and public safety and convenience in the selection of drainage plan elements.
(Ord. 7-28, passed 5-9-07 ; Am. Ord. 8-70, passed 7-16-08) Penalty, see § 152.99