(A) In addition to any other applicable permit fees set forth in the Master Fee Schedule, ASIP fees shall be charged and collected by the City’s Permits and Inspections Department. ASIP fees shall be collected with building permits for primary structure within the City’s zoning jurisdiction starting on September 1, 2016. Such fee shall be collected in full at the time that the first building permit for a primary structure is issued for a lot or tax lot.
(B) For the purposes of the ASIP, the term
DEVELOPMENT ACRE shall mean each individual acre of land within the lot or tax lot for which the permit is sought, and specifically shall exclude any land located within the public street right of way, dedicated land such as public parks, and any outlots. The ASIP fee will be collected for each development acre within the lot or tax lot where the primary building is to be constructed.
(C) ASIP fees shall be as stated in the Master Fee Schedule.
(Ord. 3844, § 5, passed 8-8-2016)