10-24-3: PLANNED UNIT DEVELOPMENT PERMITS AND APPLICATIONS:
   A.   PUD Is A Conditional Permit Within All Zoning Districts: A planned unit development shall be a conditional use within all zoning districts within the City.
   B.   A PUD Permit And A Conditional Use Permit Are Required: Any owner wishing to develop a planned unit development shall comply with the requirements of this chapter and also shall apply for and obtain a PUD permit under this chapter and a conditional use permit under chapter 15 of this title. The PUD permit application shall be submitted and reviewed concurrently as the conditional use permit application as required by chapter 15 of this title and any other application as may be required by this chapter, such as a large block plat preliminary plat application. The applicant may also concurrently file other appropriate land use applications affecting the same piece of property the applicant desires subject to the approval of the Administrator. Decisions on concurrent applications shall be voted separately by the commission and the Council.
   C.   PUD Application And Development Plan: An applicant for a PUD permit shall file with the Administrator each of the following:
      1.   PUD Permit Application: The PUD permit application shall be made upon forms furnished by the Administrator, and as part thereof shall include ten (10) copies of the PUD application, PUD development plan, large block subdivision plat, and supporting exhibits. Also, a conditional permit application under chapter 15 of this title shall be simultaneously filed with the Administrator. A PUD application shall not be deemed filed with the City until all required plans, plats information, documents and concurrent applications have been filed with and all required fees paid to the Administrator. The Administrator shall certify the date when a PUD permit application and the conditional use permit application are each deemed complete and filed with Bellevue. The original application shall be kept on file at Bellevue City Hall and a copy of the certified application form shall be given to the applicant. The PUD permit application shall consist of the following:
         a.   PUD Application: The application shall contain the following information and exhibits:
            (1)   Name, address and telephone number of applicant.
            (2)   Legal description of the property.
            (3)   A vicinity map at a scale approved by the Administrator, showing property lines, streets, existing zoning and such other items as the Administrator may reasonably require.
            (4)   A current title report together with a copy of the owner's recorded deed to said property or copy of the document establishing the applicant's interest in the subject property. If the applicant is acting as the agent of the owners, a written and notarized appointment as agent of the owner(s) of record of said real property shall be filed. If the owner is a partnership or limited liability company or closely held corporation the name and address of each person having an interest therein.
            (5)   Proposed schedule for the development of the project and construction of infrastructure.
            (6)   A map showing the lots and parcels of land within three hundred feet (300') of the exterior boundaries of the property in question, together with a list of the names and addresses of the property owner and residents of each parcel within the three hundred feet (300') together with stamped envelopes addressed to each of the names on said list.
            (7)   Payment of the applicable fees established by resolution of the Council.
            (8)   Additional studies and information may be reasonably required prior to or during the review process by the Administrator, Commission or Council of the social, economic, fiscal or environmental effects of the proposed development.
         b.   PUD Development Plan: As part of the application, a PUD Development Plan shall be submitted which shall contain the following:
            (1)   The scale, northpoint and date;
            (2)   The name of the proposed development;
            (3)   The name, address, mailing address and telephone number of each engineer, surveyor, or other person preparing the development plan and/or accompanying information or documents;
            (4)   The scaled location of existing buildings, water bodies and courses, adjacent streets, alleys, and easements, public and private, and exterior boundary lines of the property together with dimensions; and, the location of existing structures on adjacent properties;
            (5)   Location of zoning district lines within the proposed project and within the immediate vicinity;
            (6)   The location of existing and proposed street rights-of-way, including dimensions and proposed street names, lots and lot lines, and easements (public and private);
            (7)   The location, size and proposed use of all land intended to be dedicated for public use or for common use of all future property owners within the proposed development;
            (8)   The preliminary design, location, size and type of sanitary and storm sewers, water mains and facilities, culverts, utilities, street improvements, street lighting, curbs, gutters, sidewalks, private irrigation systems, and all other existing and proposed utilities and other surface or subsurface structures within, immediately adjacent to, or proposed to serve the development. Except for the large block subdivision plat, these plans need not be construction level drawings, but shall be prepared by an Idaho licensed engineer;
            (9)   The boundaries of the floodplain, floodway, wetlands, and avalanche hazard areas within or affecting the development;
            (10)   Proposed lot area of each lot;
            (11)   A surveyed contour map of the existing topography of the property and a contour map of the proposed development with contour lines at a maximum interval of five feet (5') to show the existing and proposed configuration of the land together with the documentation upon which such contour maps were prepared;
            (12)   A survey plat of the property;
            (13)   General building design standards for each phase or housing type within the project. This shall include elevations and floor plans showing the general design elements of building types proposed within the PUD, including, without limitation, approximate square footages, heights and materials. A PUD or portion thereof limited to construction of single family dwellings on lots meeting the minimum lot size, need not submit elevations and floor plans, but general building design standards to prevent construction of homes of substantially similar design. This does not constitute a design review application and any design review application and approval will be subject to the ordinances in effect at the time of such application;
            (14)   A general drainage plan showing the location, size and direction of all water courses and drainage flows, all drainage canals and structures, the proposed method of disposing of runoff water, and the approximate location and size of all drainage easements, whether they are located within or outside of the proposed development;
            (15)   A landscaping plan showing the location and size of existing mature trees, and established shrub masses, and conceptually showing the location, and a list of the size and type of proposed landscaping of the project;
            (16)   Tabulation of the anticipated average percentage of lot coverage by proposed buildings, and percentage of lot coverage by proposed parking areas shown by uses together with the total square footage of the parcel of property. A PUD or portion thereof limited to construction of single family dwellings on lots meeting the minimum lot size, need not submit such information;
            (17)   A map showing existing vegetation, significant wildlife habitat, migration corridors, breeding areas and critical winter range within the property;
            (18)   Studies may be reasonably required prior to or during the review process by the Administrator, Commission or Council of the social, economic, fiscal environmental or other impacts or effects of the proposed development;
            (19)   Additional information as reasonably required at the discretion of the Administrator, Commission or Council prior to or during the review process.
         c.   PUD Large Block Subdivision Plat: As part of the application, a preliminary large block subdivision plat shall be prepared in accordance with the requirements of this chapter and the Bellevue subdivision ordinance of all large blocks proposed within the PUD. In addition, the large block plat shall include for each large block the maximum allowable residential densities and housing types, square footages of structures thereon, non- residential uses, location of required building envelopes, location of all streets, alleys, pathways, easements, open spaces, parks, and other recreational facilities, public spaces and lands. As a condition of final PUD permit approval, the applicant shall prepare a final large block subdivision plat in accordance with the requirements of the Bellevue subdivision ordinance and the PUD permit approval, and cause the same to be recorded in the Office of the Blaine County Recorder.
         d.   Waivers And Modifications: Waiver or modification of any of the requirements of the bulk, setback, lot size or other physical standards of this title or Bellevue subdivision ordinance may be granted as the Council deems appropriate on a case-by-case basis under the standards and criteria of this chapter and chapter 15 of this title subject to such conditions, limitations and/or additional development standards as the Council may prescribe: 1) to mitigate adverse impact thereof, 2) to further the land use policies of the City, 3) to ensure that the benefits derived from the development justify a departure from the traditional zoning and subdivision regulations, 4) to meet the intent of this chapter, 5) protect the public health, safety and welfare, and/or 6) not be detrimental to property owners and residents of the immediate area or the City. As part of the PUD permit application, an applicant shall file a written list of waivers or modifications requested for the proposed PUD. This list may be modified to reflect any changes in the application during the review process. The granting of any requested waiver or modification shall be expressly stated in the written PUD permit to be valid and shall be subject to such conditions as the Council determines are appropriate.
         e.   Phased Development Schedule And Agreement: The development of the PUD may be planned in phases provided that as part of the PUD permit application a development schedule is submitted by the applicant and such schedule approved by the Council as part of a Phased Development Agreement between the applicant and City. The development schedule shall contain a detailed statement of which large blocks are within each phase and the time schedule for the construction of infrastructure improvements, amenities, recreational facilities, open space, useable open space and improvements, and public facilities and dedications in each phase. Each phase shall be planned with regard to infrastructure, public services and facilities to be self-sufficient and not dependent on later phases and so that failure to proceed to the subsequent phases of a PUD will not have any adverse impacts on the PUD, the surrounding area or the community in general.
         f.   Fees: The applicant shall pay to the City the PUD permit application fee set by resolution of the Council to reimburse the City for the reasonable costs to administer and review the application. (Ord. 2006-15, 8-10-2006)