8-2-7: EXCAVATION REQUIREMENTS:
   A.   Permit Required: The existence of a sewer connection permit shall not permit any work for which the street excavation permit is required by the City.
   B.   Safety Precautions: All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard.
   C.   Restoration Of Excavation Area: Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in accordance with the street standards ordinance at the applicant's expense. (Ord. 2010-07, 9-23-2010)