927.09 STORM DISCHARGE REQUIREMENTS.
   The written permit required by the City Engineer to construct a house sewer or drain connecting with a public storm sewer shall specify the permissible use of such house sewer or drain. Such specifications shall be governed by the following requirements:
   (a)   Storm sewers or drains may be used for the removal of surface water, rain water from roofs, subsoil drainage, building foundation drainage, cistern overflow, clear water from condensers, wastewater from water motors, any other clean and unobjectable wastewater.
   (b)   Storm sewers or drains shall not receive sewage, industrial waste septic tank wastewater, cesspool overflow, privy vault drainage, kitchen waste, or any other liquid waste of objectable character.
   (c)   After a storm sewer or drain to be connected with a public storm sewer is laid, and before it is covered or used, it shall be inspected and approved by the City Engineer or his/her authorized agent.
(Ord. 01-24. Passed 3-13-01.)