Where additional buildings on the same lot or lots, or lots of subdivisions are connected to an existing sewer serving such lot or lots, or lots of a subdivision, tapping fee, in an amount equal to the prescribed fee, is required for each additional building served by the new connection.
(Ord. 85-79. Passed 12-10-85.)