Section
Article I: General Provisions
151.01 Statutory authorization, findings of fact, purpose, and objectives
151.02 Definitions
151.03 Lands to which this chapter applies
151.04 Basis for establishing regulatory flood data
151.05 Establishment of floodplain development permit
151.06 Compliance
151.07 Abrogation and greater restrictions
151.08 Discrepancy between mapped floodplain and actual ground elevations
151.09 Interpretation
151.10 Warning and disclaimer of liability
151.11 Increased cost of compliance (ICC)
Article II. Administration
151.25 Designation of Administrator
151.26 Permit procedures
151.27 Duties and responsibilities of the Floodplain Administrator
Article III. Provisions for Flood Hazard Reduction
151.40 General standards; specific standards
151.41 Standards for subdivision proposals
151.42 Critical facility
151.43 Standards for identified floodways
151.44 Standards for identified fringe
151.45 Standards for SFHAs without established base flood elevation and/or floodways/ fringes
151.46 Standards for flood-prone areas
Article IV. Variances
151.60 Designation of variance and appeals board
151.61 Duties of variance and appeals board
151.62 Variance procedures, conditions, and notification
151.63 Historic structures
151.64 Special conditions
151.99 Penalty
ARTICLE I: GENERAL PROVISIONS
(A) Statutory authorization. The state legislature has in I.C. 36-7-4 and I.C. 14-28-4 granted the power to local government units to control land use within their jurisdictions. Therefore, the Common Council of the city does hereby adopt the following floodplain management regulations.
(B) Findings of fact.
(1) The flood hazard areas of the city are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety, and general welfare.
(2) These flood losses are caused by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities, and by the occupancy in flood hazard areas by uses vulnerable to floods or hazardous to other lands which are inadequately elevated, flood-proofed, or otherwise unprotected from flood damages.
(C) Statement of purpose. It is the purpose of this chapter to promote the public health, safety, and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
(1) Restrict or prohibit uses which are dangerous to health, safety, and property due to water or erosion hazards, which result in damaging increases in erosion or in flood heights or velocities;
(2) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;
(3) Control the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of flood waters;
(4) Control filling, grading, dredging, and other development which may increase erosion or flood damage;
(5) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands; and
(6) Make federally subsidized flood insurance available for structures and their contents in the city by fulfilling the requirements of the National Flood Insurance Program.
(D) Objectives. The objectives of this chapter are:
(1) To protect human life and health;
(2) To minimize expenditure of public money for costly flood control projects;
(3) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(4) To minimize prolonged business interruptions;
(5) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone, and sewer lines, streets, and bridges located in floodplains;
(6) To help maintain a stable tax base by providing for the sound use and development of flood-prone areas in such a manner as to minimize flood blight areas, and;
(7) To ensure that potential home buyers are notified that property is in a flood area.
(Ord. 10-2010, passed 8-10-10)
For the purpose of this chapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning.
A ZONE. Portions of the SFHA in which the principal source of flooding is runoff from rainfall, snowmelt, or a combination of both. In A ZONES, floodwaters may move slowly or rapidly, but waves are usually not a significant
threat to buildings. These areas are labeled as
ZONE A, ZONE AE, ZONES A1 – A30, ZONE AO, ZONE AH, ZONE AR, and ZONE A99 on a FIRM or FHBM. The definitions are presented below:
ZONE A. Areas subject to inundation by the one- percent annual chance flood event. Because detailed hydraulic analyses have not been performed, no base flood elevation or depths are shown. Mandatory flood insurance purchase requirements apply.
ZONE AE and A1 – A30. Areas subject to inundation by the one-percent annual chance flood event determined by detailed methods. Base flood elevations are shown within these zones. Mandatory flood insurance purchase requirements apply. (ZONE AE is on new and revised maps in place of ZONES A1 – A30.)
ZONE AO. Areas subject to inundation by one- percent annual chance shallow flooding (usually sheet flow on sloping terrain) where average depths are between one and three feet. Average flood depths derived from detailed hydraulic analyses are shown within this zone. Mandatory flood insurance purchase requirements apply.
ZONE AH. Areas subject to inundation by one- percent annual chance shallow flooding (usually areas of ponding) where average depths are between one and three feet. Average flood depths derived from detailed hydraulic analyses are shown within this zone. Mandatory flood insurance purchase requirements apply.
ZONE AR. Areas that result from the decertification of a previously accredited flood protection system that is determined to be in the process of being restored to provide base flood protection. Mandatory flood insurance purchase requirements apply.
ZONE A99. Areas subject to inundation by the one-percent annual chance flood event, but which will ultimately be protected upon completion of an under- construction federal flood protection system. These are areas of special flood hazard where enough progress has been made on the construction of a protection system, such as dikes, dams, and levees, to consider it complete for insurance rating purposes. ZONE A99 may only be used when the flood protection system has reached specified statutory progress toward completion. No base flood elevations or depths are shown. Mandatory flood insurance purchase requirements apply.
ACCESSORY STRUCTURE or APPURTENANT STRUCTURE. A structure that is located on the same parcel of property as the principal structure and the use of
which is incidental to the use of the principal structure. Accessory structures should constitute a minimal initial investment, may not be used for human habitation, and should be designed to have minimal flood damage potential. Examples of accessory structures are detached garages, carports, storage sheds, pole barns, and hay sheds.
ADDITION (TO AN EXISTING STRUCTURE). Any walled and roofed expansion to the perimeter of a structure in which the addition is connected by a common load- bearing wall other than a firewall. Any walled and roofed addition, which is connected by a firewall or is separated by independent perimeter load-bearing walls, is new construction.
APPEAL. A request for a review of the floodplain administrator's interpretation of any provision of this chapter or a request for a variance.
AREA OF SHALLOW FLOODING. A designated AO or AH Zone on the community's flood insurance rate map (FIRM) with base flood depths from one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
BASE FLOOD ELEVATION or BFE. The elevation of the one-percent annual chance flood. Basement means that portion of a structure having its floor sub-grade (below ground level) on all sides.
BUILDING. See STRUCTURE.
COMMUNITY. A political entity that has the authority to adopt and enforce floodplain ordinances for the area under its jurisdiction.
COMMUNITY RATING SYSTEM or CRS. A program developed by the Federal Insurance Administration to provide incentives for those communities in the regular program that have gone beyond the minimum floodplain management requirements to develop extra measures to provide protection from flooding.
CRITICAL FACILITY. A facility for which even a slight chance of flooding might be too great. CRITICAL FACILITIES include but are not limited to schools, nursing homes, hospitals, police, fire, and emergency response installations, installations which produce, use, or store hazardous materials or hazardous waste.
DEVELOPMENT. Any man-made change to improved or unimproved real estate, including but not limited to:
(1) Construction, reconstruction, or placement of a structure or any addition to a structure;
(2) Installing a manufactured home on a site, preparing a site for a manufactured home, or installing a recreational vehicle on a site for more than 180 days;
(3) Installing utilities, erection of walls and fences, construction of roads, or similar projects;
(4) Construction of flood control structures such as levees, dikes, dams, channel improvements, etc.;
(5) Mining, dredging, filling, grading, excavation, or drilling operations;
(6) Construction and/or reconstruction of bridges or culverts;
(7) Storage of materials; or
(8) Any other activity that might change the direction, height, or velocity of flood or surface waters.
DEVELOPMENT does not include activities such as the maintenance of existing structures and facilities, such as painting, re-roofing, resurfacing roads, or gardening, plowing, and similar agricultural practices that do not involve filling, grading, excavation, or the construction of permanent structures.
DRY FLOOD PROOFING. See FLOODPROOFING.
ELEVATED STRUCTURE. A non-basement structure built to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, filled stem wall foundations (also called chain walls), pilings, or columns (posts and piers).
ELEVATION CERTIFICATE. A certified statement that verifies a structure's elevation information.
EMERGENCY PROGRAM. The first phase under which a community participates in the NFIP. It is intended to provide a first layer amount of insurance at subsidized rates on all insurable structures in that community before the effective date of the initial FIRM.
ENCROACHMENT. The advance or infringement of uses, fill, excavation, buildings, permanent structures, or development into a floodplain, which may impede or alter the flow capacity of a floodplain.
EXISTING CONSTRUCTION. Any structure for which the start of construction commenced before the effective date of the community's first floodplain ordinance.
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the community's first floodplain ordinance.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION. The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
FEMA. The Federal Emergency Management Agency.
FIVE-HUNDRED YEAR FLOOD or 500-YEAR FLOOD. The flood that has a 0.2 percent chance of being equaled or exceeded in any year.
FLOOD. A general and temporary condition of partial or complete inundation of normally dry land areas from the overflow, the unusual and rapid accumulation, or the runoff of surface waters from any source.
FLOOD BOUNDARY AND FLOODWAY MAP or FBFM. An official map on which the Federal Emergency Management Agency (FEMA) or Federal Insurance Administration (FIA) has delineated the areas of flood hazards and regulatory floodway.
FLOOD HAZARD BOUNDARY MAP or FHBM. An official map of a community, issued by FEMA, where the boundaries of the areas of special flood hazard have been identified as Zone A.
FLOOD INSURANCE RATE MAP or FIRM. An official map of a community, on which FEMA has delineated both the areas of special flood hazard and the risk premium zones applicable to the community.
FLOOD INSURANCE STUDY or FIS. The official hydraulic and hydrologic report provided by FEMA. The report contains flood profiles, as well as the FIRM, FBFM (where applicable), and the water surface elevation of the base flood.
FLOOD PRONE AREA. Any land area acknowledged by a community as being susceptible to inundation by water from any source. See FLOOD.
FLOOD PROTECTION GRADE or FPG. The elevation of the regulatory flood plus two feet at any given location in the SFHA. See FREEBOARD.
FLOODPLAIN. The channel proper and the areas adjoining any wetland, lake, or watercourse which have been or hereafter may be covered by the regulatory flood. The FLOODPLAIN includes both the floodway and the fringe districts.
FLOODPLAIN MANAGEMENT. The operation of an overall program of corrective and preventive measures for reducing flood damage and preserving and enhancing, where possible, natural resources in the floodplain, including but not limited to emergency preparedness plans, flood control works, floodplain management regulations, and open space plans.
FLOODPLAIN MANAGEMENT REGULATIONS. This chapter and other zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances, and other applications of police power which control development in flood-prone areas. This term describes federal, state, or local regulations in any combination thereof, which provide standards for preventing and reducing flood loss and damage. FLOODPLAIN MANAGEMENT REGULATIONS are also referred to as floodplain regulations, floodplain ordinance, flood damage prevention ordinance, and floodplain management requirements.
FLOODPROOFING or DRY FLOOD PROOFING. A method of protecting a structure that ensures that the structure, together with attendant utilities and sanitary facilities, is watertight to the floodproofed design elevation with walls that are substantially impermeable to the passage of water. All structural components of these walls are capable of resisting hydrostatic and hydrodynamic flood forces, including the effects of buoyancy and anticipated debris impact forces.
FLOODPROOFING CERTIFICATE. A form used to certify compliance for non-residential structures as an alternative to elevating structures to or above the FPG. This
certification must be by a registered professional engineer or architect.
FLOODWAY. The channel of a river or stream and those portions of the floodplains adjoining the channel which are reasonably required to efficiently carry and discharge the peak flood flow of the regulatory flood of any river or stream.
FREEBOARD. A factor of safety, usually expressed in feet above the BFE, which is applied for the purposes of floodplain management. It is used to compensate for the many unknown factors that could contribute to flood heights greater than those calculated for the base flood.
FRINGE. Those portions of the floodplain lying outside the floodway.
FUNCTIONALLY DEPENDENT FACILITY. A facility which cannot be used for its intended purpose unless it is located or carried out in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, ship repair, or seafood processing facilities. The term does not include long-term storage, manufacture, sales, or service facilities.
HARDSHIP. As related to variances of this chapter, the exceptional HARDSHIP that would result from a failure to grant the requested variance. The city Board of Zoning Appeals requires that the variance is exceptional, unusual, and peculiar to the property involved. Mere economic or financial hardship alone is NOT exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one's neighbors likewise cannot, as a rule, qualify as an exceptional hardship. All of these problems can be resolved through other means without granting a variance, even if the alternative is more expensive, or requires the property owner to build elsewhere or put the parcel to a different use than originally intended.
HIGHEST ADJACENT GRADE. The highest natural elevation of the ground surface, prior to the start of construction, next to the proposed walls of a structure.
HISTORIC STRUCTURE. Any structure individually listed on the National Register of Historic Places or the State Register of Historic Sites and Structures.
INCREASED COST OF COMPLIANCE or ICC. The cost to repair a substantially damaged structure that exceeds the minimal repair cost and that is required to bring a substantially damaged structure into compliance with the local flood damage prevention ordinance. Acceptable mitigation measures are elevation, relocation, demolition,
or any combination thereof. All renewal and new business flood insurance policies with effective dates on or after June 1, 1997, will include
ICC coverage.
LETTER OF MAP AMENDMENT or LOMA. An amendment to the currently effective FEMA map that establishes that a property is not located in a SFHA. A LOMA is only issued by FEMA.
LETTER OF MAP REVISION or LOMR. An official revision to the currently effective FEMA map. It is issued by FEMA and changes flood zones, delineations, and elevations.
LETTER OF MAP REVISION BASED ON FILL or LOMR-F. An official revision by letter to an effective NFIP map. A LOMR-F provides FEMA's determination concerning whether a structure or parcel has been elevated on fill above the BFE and excluded from the SFHA.
LOWEST ADJACENT GRADE. The lowest elevation, after completion of construction, of the ground, sidewalk, patio, deck support, or basement entryway immediately next to the structure.
LOWEST FLOOR. The lowest of the following:
(1) The top of the lowest level of the structure;
(2) The top of the basement floor;
(3) The top of the garage floor, if the garage is the lowest level of the structure;
(4) The top of the first floor of a structure elevated on pilings or pillars;
(5) The top of the first floor of a structure constructed with a crawl space, provided that the lowest point of the interior grade is at or above the BFE and construction meets requirements of division (6)(a) of this definition; or
(6) The top of the floor level of any enclosure, other than a basement, below an elevated structure, where the walls of the enclosure provide any resistance to the flow of flood waters unless:
(a) The walls are designed to automatically equalize the hydrostatic flood forces on the walls by allowing for the entry and exit of flood waters by providing a minimum of two openings (in addition to doorways and windows) in a minimum of two exterior walls having a total net area of one square inch for every one square foot of enclosed area. The bottom of all such openings shall be no higher than one foot above the exterior grade or the interior grade immediately beneath each opening, whichever is higher, and shall be located entirely below the BFE; and
(b) Such enclosed space shall be usable solely for the parking of vehicles and building access.
MANUFACTURED HOME. A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term MANUFACTURED HOME does not include a recreational vehicle.
MANUFACTURED HOME PARK OR SUBDIVISION. A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
MAP AMENDMENT. A change to an effective NFIP map that results in the exclusion from the SFHA of an individual structure or a legally described parcel of land that has been inadvertently included in the SFHA (i.e., no alterations of topography have occurred since the date of the first NFIP map that showed the structure or parcel to be within the SFHA).
MAP PANEL NUMBER. The four-digit number followed by a letter suffix assigned by FEMA on a flood map. The first four digits represent the map panel, and the letter suffix represents the number of times the map panel has been revised. (The letter “A” is not used by FEMA, the letter “B” is the first revision.)
MARKET VALUE. The building value, excluding the land (as agreed to between a willing buyer and seller), as established by what the local real estate market will bear. MARKET VALUE can be established by independent certified appraisal, replacement cost depreciated by age of building (actual cash value), or adjusted assessed values.
MITIGATION. Sustained actions taken to reduce or eliminate long-term risk to people and property from hazards and their effects. The purpose of MITIGATION is two-fold: to protect people and structures and to minimize the cost of disaster response and recovery.
NATIONAL FLOOD INSURANCE PROGRAM or NFIP. The federal program that makes flood insurance available to owners of property in participating communities nationwide through the cooperative efforts of the federal government and the private insurance industry.
NATIONAL GEODETIC VERTICAL DATUM (NGVD) OF 1929. As corrected in 1929, a vertical control used as a reference for establishing varying elevations within the floodplain.
NEW CONSTRUCTION. Any structure for which the start of construction commenced after the effective date of the community's first floodplain ordinance.
NEW MANUFACTURED HOME PARK OR SUBDIVISION. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of the community's first floodplain ordinance.
NORTH AMERICAN VERTICAL DATUM OF 1988 or NAVD 88. As adopted in 1993, a vertical control datum used as a reference for establishing varying elevations within the floodplain.
OBSTRUCTION. Includes but is not limited to any dam, wall, wharf, embankment, levee, dike, pile, abutment, protection, excavation, canalization, bridge, conduit, culvert, building, wire, fence, rock, gravel, refuse, fill, structure, vegetation, or other material in, along, across, or projecting into any watercourse which may alter, impede, retard, or change the direction and/or velocity of the flow of water; or, due to its location, its propensity to snare or collect debris carried by the flow of water, or its likelihood of being carried downstream.
ONE-HUNDRED YEAR FLOOD or 100-YEAR FLOOD. The flood that has a one-percent chance of being equaled or exceeded in any given year. Any flood zone that begins with the letter A is subject to the one-percent annual chance flood. See REGULATORY FLOOD.
ONE-PERCENT ANNUAL CHANCE FLOOD. The flood that has a one percent chance of being equaled or exceeded in any given year. Any flood zone that begins with the letter A is subject to the one-percent annual chance flood. See REGULATORY FLOOD.
PARTICIPATING COMMUNITY. Any community that voluntarily elects to participate in the NFIP by adopting and enforcing floodplain management regulations that are consistent with the standards of the NFIP.
PHYSICAL MAP REVISION or PMR. An official republication of a community's FEMA map to effect changes to base (one-percent annual chance) flood
elevations, floodplain boundary delineations, regulatory floodways, and planimetric features. These changes typically occur as a result of structural works or improvements, annexations resulting in additional flood hazard areas, or correction to base flood elevations or SFHAs.
POST-FIRM CONSTRUCTION. Construction or substantial improvement that started on or after the effective date of the initial FIRM of the community or after December 31, 1974, whichever is later.
PRE-FIRM CONSTRUCTION. Construction or substantial improvement which started on or before December 31, 1974, or before the effective date of the initial FIRM of the community, whichever is later.
PROBATION. A means of formally notifying participating communities of violations and deficiencies in the administration and enforcement of the local floodplain management regulations.
PUBLIC SAFETY AND HEALTH NUISANCE. Anything which is injurious to the safety or health of an entire community, neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or basin.
RECREATIONAL VEHICLE. A vehicle which is:
(1) Built on a single chassis;
(2) Four hundred square feet or less when measured at the largest horizontal projections;
(3) Designed to be self-propelled or permanently towable by a light duty truck; and
(4) Designed primarily not for use as a permanent dwelling, but as quarters for recreational camping, travel, or seasonal use.
REGULAR PROGRAM. The phase of the community's participation in the NFIP where more comprehensive floodplain management requirements are imposed and higher amounts of insurance are available based upon risk zones and elevations determined in a FIS.
REGULATORY FLOOD. The flood having a one percent chance of being equaled or exceeded in any given year, as calculated by a method and procedure that is acceptable to and approved by the state Department of
Natural Resources and the Federal Emergency Management Agency. The regulatory flood elevation at any location is as defined in § 151.04 of this chapter. The
REGULATORY FLOOD is also known by the terms “base flood,” “one- percent annual chance flood,” and “100-year flood.”
REPETITIVE LOSS. Flood-related damages sustained by a structure on two separate occasions during a 10-year period ending on the date of the event for which the second claim is made, in which the cost of repairing the flood damage, on the average, equaled or exceeded 25% of the market value of the structure at the time of each such flood event.
SECTION 1316. That section of the National Flood Insurance Act of 1968, as amended, which states that no new flood insurance coverage shall be provided for any property that the Administrator finds has been declared by a duly constituted state or local zoning authority or other authorized public body to be in violation of state or local laws, regulations, or ordinances that intended to discourage or otherwise restrict land development or occupancy in flood-prone areas.
SPECIAL FLOOD HAZARD AREA or SFHA. Those lands within the jurisdiction of the city subject to inundation by the regulatory flood. The SFHAs of the city are generally identified as such on the Lawrence County, Indiana, and Incorporated Areas Flood Insurance Rate Map prepared by the Federal Emergency Management Agency, dated December 3, 2010. (These areas are shown on a FHBM or FIRM as Zone A, AE, A1 – A30, AH, AR, A99, or AO).
START OF CONSTRUCTION. Includes substantial improvement, and means the date the building permit was issued, provided that the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement or permanent construction of a structure (including a manufactured home) on a site, such as the pouring of slabs or footing, installation of piles, construction of columns, or any work beyond the stage of excavation for placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, foundations, or the erection of temporary forms. For substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
STRUCTURE. A structure that is principally above ground and is enclosed by walls and a roof. The term includes a gas or liquid storage tank, a manufactured home, or a prefabricated building. The term also includes recreational vehicles to be installed on a site for more than 180 days.
SUBSTANTIAL DAMAGE. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50% of the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT. Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50% of the market value of the structure before the start of construction of the improvement. This term includes structures that have incurred repetitive loss or substantial damage regardless of the actual repair work performed. The term does not include improvements of structures to correct existing violations of state or local health, sanitary, or safety code requirements or any alteration of a historic structure, provided that the alteration will not preclude the structures continued designation as a historic structure.
SUSPENSION. The removal of a participating community from the NFIP because the community has not enacted and/or enforced the proper floodplain management regulations required for participation in the NFIP.
VARIANCE. A grant of relief from the requirements of this chapter, which permits construction in a manner otherwise prohibited by this chapter where specific enforcement would result in unnecessary hardship.
VIOLATION. The failure of a structure or other development to be fully compliant with this chapter. A structure or other development without the elevation, other certification, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided.
WATERCOURSE. A lake, river, creek, stream, wash, channel, or other topographic feature on or over which waters flow at least periodically. WATERCOURSE includes specifically designated areas in which substantial flood damage may occur.
WATER SURFACE ELEVATION. The height, in relation to the North American Vertical Datum of 1988 (NAVD 88) or National Geodetic Vertical Datum of 1929 (NGVD) (other datum where specified) of floods of various magnitudes and frequencies in the floodplains of riverine areas.
X ZONE. The area where the flood hazard is less than that in the SFHA. Shaded X zones shown on recent FIRMS (B zones on older FIRMs) designate areas subject to inundation by the flood with a 0.2 percent chance of being equaled or exceeded (the 500-year flood). Unshaded X zones (C zones on older FIRMs) designate areas where the annual exceedance probability of flooding is less than 0.2 percent.
ZONE. A geographical area shown on a FHBM or FIRM that reflects the severity or type of flooding in the area.
ZONE A. See definition for A ZONE.
ZONE B, C, AND X. Areas identified in the community as areas of moderate or minimal hazard from the principal source of flood in the area. However, buildings in these zones could be flooded by severe, concentrated rainfall coupled with inadequate local drainage systems. Flood insurance is available in participating communities but is not required by regulation in these zones. (ZONE X is used on new and revised maps in place of ZONES B and C.)
(Ord. 10-2010, passed 8-10-10)
(A) This chapter's protection standard is the regulatory flood. The best available regulatory flood data is listed below. Whenever a party disagrees with the best available data, the party submitting the detailed engineering study needs to replace existing data with better data and submit it to the state Department of Natural Resources for review and approval.
(B) The regulatory flood elevation, floodway, and fringe limits for the studied SFHAs of the city shall be as delineated on the 100-year flood profiles in the Flood Insurance Study of Lawrence County, Indiana, and Incorporated Areas and the corresponding FIRM prepared by the Federal Emergency Management Agency and dated December 3, 2010.
(C) The regulatory flood elevation, floodway, and fringe limits for each of the remaining SFHAs delineated as an “A Zone” on the FIRM of Lawrence County, Indiana, and Incorporated Areas prepared by the Federal Emergency Management Agency and dated December 3, 2010, shall be according to the best data available as provided by the state Department of Natural Resources, provided that the upstream drainage area from the subject site is greater than one square mile.
(Ord. 10-2010, passed 8-10-10)
A floodplain development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities in areas of special flood hazard.
(Ord. 10-2010, passed 8-10-10) Penalty, see § 151.99
No structure shall hereafter be located, extended, converted, or structurally altered within the SFHA without full compliance with the terms of this chapter and other applicable regulations. No land or stream within the SFHA shall hereafter be altered without full compliance with the terms of this chapter and other applicable regulations.
(Ord. 10-2010, passed 8-10-10) Penalty, see § 151.99
This chapter is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
(Ord. 10-2010, passed 8-10-10)
(A) In cases where there is a discrepancy between the mapped floodplain (SFHA) on the FIRM and the actual ground elevations, the elevation provided on the profiles shall govern.
(B) If the elevation of the site in question is below the base flood elevation, that site shall be included in the SFHA and regulated accordingly.
(C) If the elevation (natural grade) of the site in question is above the base flood elevation, that site shall be considered outside the SFHA and the floodplain regulations will not be applied. The property owner should be advised to apply for a LOMA.
(Ord. 10-2010, passed 8-10-10)
In the interpretation and application of this chapter all provisions shall be:
(A) Considered as minimum requirements;
(B) Liberally construed in favor of the governing body; and
(C) Deemed neither to limit nor repeal any other powers granted under state statutes.
(Ord. 10-2010, passed 8-10-10)
The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on available information derived from engineering and scientific methods of study. Larger floods can and will occur on rare occasions. Therefore, this chapter does not create any liability on the part of the city, the state Department of Natural Resources, or the state, for any flood damage that results from reliance on this chapter or any administrative decision made lawfully thereunder.
(Ord. 10-2010, passed 8-10-10)
In order for buildings to qualify for a claim payment under ICC coverage as a repetitive loss structure, the National Reform Act of 1994 requires that the building be covered by a contract for flood insurance and incur flood- related damages on two occasions during a ten-year period ending on the date of the event for which the second claim is made, in which the cost of repairing the flood damage, on the average, equaled or exceeded 25% of the market value of the building at the time of each such flood event.
(Ord. 10-2010, passed 8-10-10)
ARTICLE II. ADMINISTRATION
(A) Application for a floodplain development permit shall be made to the Floodplain Administrator on forms furnished by him or her prior to any development activities, and may include but not be limited to the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the location of the foregoing.
(B) Specifically the following information is required:
(1) Application stage.
(a) A description of the proposed development;
(b) Location of the proposed development sufficient to accurately locate property and structure in relation to existing roads and streams;
(c) A legal description of the property site;
(d) A site development plan showing existing and proposed development locations and existing and proposed land grades;
(e) Elevation of the top of the lowest floor (including basement) of all proposed buildings. Elevation should be in NAVD 88 or NGVD;
(f) Elevation (in NAVD 88 or NGVD) to which any non-residential structure will be floodproofed;
(g) Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; and
(2) Construction stage. Upon placement of the lowest floor, or floodproofing, it shall be the duty of the permit holder to submit to the Floodplain Administrator a certification of the NAVD 88 or NGVD elevation of the lowest floor or floodproofed elevation, as built. Said certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by the same. When floodproofing is utilized for a particular structure, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of the certification shall be at the permit holders' risk. (The Floodplain Administrator shall review the lowest floor and floodproofing elevation survey data submitted.) The permit holder shall correct deficiencies detected by such review before any further work is allowed to proceed. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project.
(Ord. 10-2010, passed 8-10-10)
(A) The Floodplain Administrator and/or designated staff is hereby authorized and directed to enforce the provisions of this chapter. The Administrator is further authorized to render interpretations of this chapter, which are consistent with its spirit and purpose.
(B) Duties and responsibilities of the Floodplain Administrator shall include but not be limited to:
(1) Review all floodplain development permits to assure that the permit requirements of this chapter have been satisfied.
(2) Inspect and inventory damaged structures in SFHA and complete substantial damage determinations.
(3) Ensure that construction authorization has been granted by the state Department of Natural Resources for all development projects subject to §§ 151.43 and 151.45(A) of this chapter, and maintain a record of such authorization (either copy of actual permit or floodplain analysis/regulatory assessment).
(4) Ensure that all necessary federal or state permits have been received prior to issuance of the local floodplain development permit. Copies of such permits are to be maintained on file with the floodplain development permit.
(5) Notify adjacent communities and the state floodplain coordinator prior to any alteration or relocation of a watercourse, and submit copies of such notifications to FEMA.
(6) Maintain for public inspection and furnish upon request local permit documents, damaged structure inventories, substantial damage determinations, regulatory flood data, SFHA maps, letters of map amendment (LOMA), letters of map revision (LOMR), copies of DNR permits and floodplain analysis and regulatory assessments (letters of recommendation), federal permit documents, and “as-built” elevation and floodproofing data for all buildings constructed subject to this chapter.
(7) Utilize and enforce all letters of map revision (LOMR) or physical map revisions (PMR) issued by FEMA for the currently effective SFHA maps of the community.
(8) Assure that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished.
(9) Verify and record the actual elevation of the lowest floor (including basement) of all new or substantially improved structures, in accordance with § 151.26.
(10) Verify and record the actual elevation to which any new or substantially improved structures have been floodproofed, in accordance with § 151.26.
(11) Review certified plans and specifications for compliance.
(12) Stop work orders:
(a) Upon notice from the floodplain administrator, work on any building, structure, or premises
that is being done contrary to the provisions of this chapter shall immediately cease.
(b) Such notice shall be in writing and shall be given to the owner of the property, or to his or her agent, or to the person doing the work, and shall state the conditions under which work may be resumed.
(13) Revocation of permits:
(a) The floodplain administrator may revoke a permit or approval, issued under the provisions of the chapter, in cases where there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based.
(b) The floodplain administrator may revoke a permit upon determination by the floodplain administrator that the construction, erection, alteration, repair, moving, demolition, installation, or replacement of the structure for which the permit was issued is in violation of, or not in conformity with, the provisions of this chapter.
(14) Inspect sites for compliance. For all new and/or substantially improved buildings constructed in the SFHA, inspect before, during, and after construction. Authorized city officials shall have the right to enter and inspect properties located in the SFHA.
(Ord. 10-2010, passed 8-10-10)
ARTICLE III. PROVISIONS FOR FLOOD HAZARD REDUCTION
(A) General standards. In all SFHAs and known flood-prone areas, the following provisions are required:
(1) New construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure;
(2) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include but are not limited to use of over- the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;
(3) New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage below the FPG;
(4) New construction and substantial improvements shall be constructed by methods and practices that minimize flood damage;
(5) Electrical, heating, ventilation, plumbing, air conditioning equipment, utility meters, and other service facilities shall be located at/above the FPG or designed so as to prevent water from entering or accumulating within the components below the FPG. Water and sewer pipes, electrical and telephone lines, submersible pumps, and other waterproofed service facilities may be located below the FPG;
(6) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system;
(7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system;
(8) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding;
(9) Any alteration, repair, reconstruction, or improvements to a structure that is in compliance with the provisions of this chapter shall meet the requirements of new construction as contained in this chapter; and,
(10) Any alteration, repair, reconstruction, or improvement to a structure that is not in compliance with the provisions of this chapter shall be undertaken only if said non-conformity is not further extended, or replaced.
(B) Specific standards. In all SFHAs, the following provisions are required:
(1) Flood damage below the FPG. In addition to the requirements of division (A of this section, all structures to be located in the SFHA shall be protected from flood damage below the FPG. his building protection requirement applies to the following situations:
(a) Construction or placement of any new structure having a floor area greater than 400 square feet;
(b) Addition or improvement made to any existing structure:
1. Where the cost of the addition or improvement equals or exceeds 50% of the value of the existing structure (excluding the value of the land);
2. With a previous addition or improvement constructed since the community's first floodplain ordinance.
(c) Reconstruction or repairs made to a damaged structure where the costs of restoring the structure to its before damaged condition equals or exceeds 50% of the market value of the structure (excluding the value of the land) before damage occurred;
(d) Installing a travel trailer or recreational vehicle on a site for more than 180 days;
(e) Installing a manufactured home on a new site or a new manufactured home on an existing site. This chapter does not apply to returning the existing manufactured home to the same site it lawfully occupied before it was removed to avoid flood damage; and
(f) Reconstruction or repairs made to a repetitive loss structure.
(2) Residential construction. New construction or substantial improvement of any residential structure (or manufactured home) shall have the lowest floor, including basement, at or above the FPG (two feet above the base flood elevation). Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with the standards of subdivision (B)(4) of this section.
(3) Non-residential construction.
(a) New construction or substantial improvement of any commercial, industrial, or non- residential structure (or manufactured home) shall either have the lowest floor, including basement, elevated to or above the FPG (two feet above the base flood elevation) or be floodproofed to or above the FPG. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with the standards of subdivision (B)(4) of this section.
(b) Structures located in all A Zones may be floodproofed in lieu of being elevated if done in accordance with the following:
1. A registered professional engineer or architect shall certify that the structure has been designed so that below the FPG, the structure and attendant utility facilities are watertight and capable of resisting the effects of the regulatory flood. The structure design shall take into account flood velocities, duration, rate of rise, hydrostatic pressures, and impacts from debris or ice. Such certification shall be provided to the official as set forth in § 151.27(B)(10).
2. Floodproofing measures shall be operable without human intervention and without an
outside source of electricity.
(4) Elevated structures.
(a) New construction or substantial improvements of elevated structures shall have the lowest floor at or above the FPG.
(b) Elevated structures with fully enclosed areas formed by foundation and other exterior walls below the flood protection grade (crawlspaces or under-floor spaces) shall be designed to preclude finished living space and designed to allow for the entry and exit of floodwaters to automatically equalize hydrostatic flood forces on exterior walls.
(c) Designs must meet the following minimum criteria:
1. Provide a minimum of two openings located in a minimum of two exterior walls (having a total net area of not less than one square inch for every one square foot of enclosed area; and
2. All openings shall be located entirely below the BFE; and
3. The bottom of all openings shall be no higher than one foot above foundation interior grade (which must be equal to in elevation or higher than the exterior foundation grade); and
4. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic flow of floodwaters in both directions; and
5. Access to the enclosed area shall be the minimum necessary to allow for parking for vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairway or elevator); and
6. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms; and
7. The interior grade of such enclosed area shall be at an elevation at or higher than the exterior grade; and
8. An adequate drainage system must be installed to remove floodwaters from the
interior area of the crawlspace within a reasonable period of time after a flood event; and
9. Where elevation requirements exceed six feet above the highest adjacent grade, a copy of the legally recorded deed restriction prohibiting the conversion of the area below the lowest floor to a use or dimension contrary to the structure's originally approved design shall be presented as a condition of issuance of the final certificate of occupancy.
(5) Structures constructed on fill. A residential or non-residential structure may be constructed on a permanent land fill in accordance with the following:
(a) The fill shall be placed in layers no greater than 1 foot deep before compacting to 95% of the maximum density obtainable with the either the standard or modified proctor test method.
(b) The fill should extend at least ten feet beyond the foundation of the structure before sloping below the FPG.
(c) fill shall be protected against erosion and scour during flooding by vegetative cover, riprap, or bulkheading. If vegetative cover is used, the slopes shall be no steeper than three horizontal to one vertical.
(d) The fill shall not adversely affect the flow of surface drainage from or onto neighboring properties.
(e) The top of the lowest floor including basements shall be at or above the FPG.
(6) Standards for manufactured homes and recreational vehicles. Manufactured homes and recreational vehicles to be installed or substantially improved on a site for more than 180 days must meet one of the following requirements:
(a) The manufactured home shall be elevated on a permanent foundation such that the lowest floor shall be at or above the FPG and securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. This requirement applies to all manufactured homes to be placed on a site:
1. Outside a manufactured home park or subdivision;
2. In a new manufactured home park or subdivision;
3. In an expansion to an existing manufactured home park or subdivision; or
4. In an existing manufactured home park or subdivision on which a manufactured home has incurred substantial damage as a result of a flood.
(b) The manufactured home shall be elevated so that the lowest floor of the manufactured home chassis is supported by reinforced piers or other foundation elevations that are no less than 36 inches in height above grade and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. This requirement applies to all manufactured homes to be placed on a site in an existing manufactured home park or subdivision that has not been substantially damaged by a flood.
(c) Manufactured homes with fully enclosed areas formed by foundation and other exterior walls below the flood protection grade (crawlspaces or under-floor spaces) shall be designed to preclude finished living space and designed to allow for the entry and exit of floodwaters to automatically equalize hydrostatic flood forces on exterior walls as required for elevated structures in subdivision (B)(4) of this section.
(d) Flexible skirting and rigid skirting not attached to the frame or foundation of a manufactured home are not required to have openings.
(e) Recreational vehicles placed on a site shall either:
1. Be on site for less than 180 days; and
2. Be fully licensed and ready for highway use (defined as being on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions); or
3. Meet the requirements for manufactured homes as stated earlier in this section.
(Ord. 10-2010, passed 8-10-10) Penalty, see § 151.99
(A) All subdivision proposals shall be consistent with the need to minimize flood damage.
(B) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage.
(C) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards.
(D) Base flood elevation data shall be provided for subdivision proposals and other proposed development (including manufactured home parks and subdivisions), which is greater than the lesser of 50 lots or five acres.
(E) All subdivision proposals shall minimize development in the SFHA and/or limit density of development permitted in the SFHA.
(F) All subdivision proposals shall ensure safe access into/out of SFHA for pedestrians and vehicles (especially emergency responders).
(Ord. 10-2010, passed 8-10-10) Penalty, see § 151.99
Construction of new critical facilities shall be, to the extent possible, located outside the limits of the SFHA. Construction of new critical facilities shall be permissible within the SFHA if no feasible alternative site is available. Critical facilities constructed within the SFHA shall have the lowest floor elevated to or above the FPG at the site. Floodproofing and sealing measures must be taken to ensure that toxic substances will not be displaced by or released into floodwaters. Access routes elevated to or above the FPG shall be provided to all critical facilities to the extent possible.
(Ord. 10-2010, passed 8-10-10) Penalty, see § 151.99
(A) Located within SFHAs, established in § 151.04, are areas designated as floodways. The floodway is an extremely hazardous area due to the velocity of floodwaters, which carry debris, potential projectiles, and has erosion potential. If the site is in an identified floodway, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to the state Department of Natural Resources and apply for a permit for construction in a floodway. Under the provisions of I.C. 14-28-1, a permit for construction in a floodway from the state Department of Natural Resources is required prior to the issuance of a local building permit for any excavation, deposit, construction, or obstruction activity located in the floodway. This includes land preparation activities such as filling, grading, clearing, and paving, etc., undertaken before the actual start of construction of the structure. However, it does exclude non- substantial additions/improvements to existing (lawful) residences in a non-boundary river floodway. (I.C. 14-28-1-26 allows construction of non-substantial additions/improvements to residences in a non-boundary river floodway without obtaining a permit for construction in the floodway from the state Department of Natural Resources. Please note that if fill is needed to elevate an addition above the existing grade, prior approval (construction in a floodway permit) for the fill is required from the state Department of Natural Resources.);
(B) No action shall be taken by the Floodplain Administrator until a permit (when applicable) has been issued by the state Department of Natural Resources granting approval for construction in the floodway. Once a permit for construction in a floodway has been issued by the state Department of Natural Resources, the Floodplain Administrator may issue the local floodplain development permit, provided the provisions contained in Article III of this chapter have been met. The floodplain development permit cannot be less restrictive than the permit for construction in a floodway issued by the state Department of Natural Resources. However, a community's more restrictive regulations (if any) shall take precedence;
(C) No development shall be allowed which acting alone or in combination with existing or future development, will increase the regulatory flood more than 0.14 of one foot; and
(D) For all projects involving channel modifications or fill (including levees) the city shall submit the data and request that the Federal Emergency Management Agency revise the regulatory flood data.
(Ord. 10-2010, passed 8-10-10)
If the site is located in an identified fringe, then the Floodplain Administrator may issue the local floodplain development permit provided that the provisions contained in Article III of this chapter have been met. The key provision is that the top of the lowest floor of any new or substantially improved structure shall be at or above the FPG.
(Ord. 10-2010, passed 8-10-10)
(A) Drainage area upstream of the site is greater than one square mile:
(1) If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined, and the drainage area upstream of the site is greater than one square mile, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to the state Department of Natural Resources for review and comment.
(2) No action shall be taken by the Floodplain Administrator until either a permit for construction in a floodway or a floodplain analysis/regulatory assessment citing the 100-year flood elevation and the recommended flood protection grade has been received from the state Department of Natural Resources.
(3) Once the Floodplain Administrator has received the proper permit for construction in a floodway or floodplain analysis/regulatory assessment approving the proposed development, a floodplain development permit may be issued provided the conditions of the floodplain development permit are not less restrictive than the conditions received from the state Department of Natural Resources and the provisions contained in Article III of this chapter have been met.
(B) Drainage area upstream of the site is less than one square mile:
(1) If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined and the drainage area upstream of the site is less than one square mile, the Floodplain Administrator shall require the applicant to provide an engineering analysis showing the limits of the floodplain and 100-year flood elevation for the site.
(2) Upon receipt, the Floodplain Administrator may issue the local floodplain development permit, provided that the provisions contained in Article III of this chapter have been met.
(C) The total cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the regulatory flood more than 0.14 of one foot and will not increase flood damages or potential flood damages.
(Ord. 10-2010, passed 8-10-10)
ARTICLE IV. VARIANCE PROCEDURES
The board shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the Floodplain Administrator in the enforcement or administration of this chapter. Any person aggrieved by the decision of the board may appeal such decision to the county circuit court.
(Ord. 10-2010, passed 8-10-10)
(A) Procedures. In passing upon such applications, the Board of Zoning Appeals shall consider all technical evaluations, all relevant factors, all standards specified in other sections of this chapter, and:
(1) The danger of life and property due to flooding or erosion damage;
(2) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner;
(3) The importance of the services provided by the proposed facility to the community;
(4) The necessity to the facility of a waterfront location, where applicable;
(5) The availability of alternative locations for the proposed use which are not subject to flooding or erosion damage;
(6) The compatibility of the proposed use with existing and anticipated development;
(7) The relationship of the proposed use to the comprehensive plan and floodplain management program for that area;
(8) The safety of access to the property in times of flood for ordinary and emergency vehicles;
(9) The expected height, velocity, duration, rate of rise, and sediment of transport of the floodwaters at the site; and
(10) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water systems, and streets and bridges.
(B) Conditions.
(1) Variances shall only be issued when there is:
(a) A showing of good and sufficient cause;
(b) A determination that failure to grant the variance would result in exceptional hardship; and
(c) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud or victimization of the public, or conflict with existing laws or ordinances.
(4) Variances to the provisions for flood hazard reduction of § 151.40(B) may be granted only when a new structure is to be located on a lot of one-half acre or less in size, contiguous to and surrounded by lots with existing structures constructed below the flood protection grade.
(5) Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
(6) Variances may be granted for the reconstruction or restoration of any structure individually listed on the National Register of Historic Places or the State Register of Historic Sites and Structures.
(7) Any application to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation to which the lowest floor is to be built and stating that the cost of the flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. (See division (C) of this section.)
(8) The Floodplain Administrator shall maintain the records of appeal actions and report any variances to the Federal Emergency Management Agency or the state Department of Natural Resources upon request. (See division (C) of this section.)
(C) Notification. Any applicant to whom a variance is granted shall be given written notice over the signature of a community official that:
(1) The issuance of a variance to construct a structure below the base flood elevation will result in increased premium rates for flood insurance up to amounts as high as $25 for $100 of insurance coverage; and
(2) Such construction below the base flood level increases risks to life and property. A copy of the notice shall by recorded by the Floodplain Administrator in the office of the county recorder and shall be recorded in a manner so that it appears in the chain of title of the affected parcel of land.
(3) The Floodplain Administrator will maintain a record of all variance actions, including justification for their issuance, and report such variances issued in the community's biennial report submission to the Federal Emergency Management Agency.
(Ord. 10-2010, passed 8-10-10)
Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as an historic structure and the variance is the minimum to preserve the historic character and design of the structure.
(Ord. 10-2010, passed 8-10-10)
(A) Failure to obtain a floodplain development permit in the SFHA or failure to comply with the requirements of a floodplain development permit or conditions of a variance shall be deemed to be a violation of this chapter. All violations shall be considered a common nuisance and be treated as such in accordance with the provisions of the zoning code for the city. All violations shall be punishable by a fine not exceeding $500.
(B) (1) A separate offense shall be deemed to occur for each day the violation continues to exist.
(2) The Floodplain Administrator shall inform the owner that any such violation is considered a willful act to increase flood damages and therefore may cause coverage by a standard flood insurance policy to be suspended.
(3) Nothing herein shall prevent the city from taking such other lawful action to prevent or remedy any violations. All costs connected therewith shall accrue to the person or persons responsible.
(Ord. 10-2010, passed 8-10-10)