Manufactured and mobile homes may be permitted under the following conditions, fees, and standards otherwise required by this chapter.
(A) Temporary residence. A temporary permit shall be issued to an applicant in the process of building a conventional dwelling to locate a manufactured or mobile home on a building lot during the course of construction of the dwelling. The permit shall not be issued until a building permit for the dwelling has been issued.
(B) Construction office. A temporary permit shall be issued to an applicant to use a manufactured or mobile home as a caretaker’s quarters or construction office at the job site.
(C) Length of permit. A temporary use permit may be issued, at the discretion of the Zoning Administrator, for a period not to exceed one year. The temporary permit may be renewed for additional six-month periods upon showing of good cause, and with permission to do so.
(D) Permit expiration. At the time the temporary permit expires, the manufactured or mobile home and all appurtenances shall be removed from the property within 30 days.
(E) Utility requirements. Manufactured or mobile homes used for temporary uses shall have an approved water supply, sewage disposal system, and utility connections, where appropriate, and at the discretion of the Plan Commission’s designated administrator.
(F) Permits. A temporary use permit shall be issued by the Zoning Administrator. The fee shall be $25 and is in addition to all other required permits for utilities and sewage disposal systems.
(Ord. 28-1984, passed 8-14-84) Penalty, see § 155.999