A. Deposits: The remainder of any deposit, if there is a remainder, shall be refunded to the person making such deposit, or to his assigns.
B. Issuance Fee: An issuance fee may be refunded when a permit has been issued as the result of an error not made by the permittee.
C. Erroneous Collection Of Fees: The fee deposited for inspection or any other unit fee established may be refunded if it was erroneously collected or if the work was not constructed by the permittee. (Ord. 09-230, 1-8-2009)