6-1-9: RESTORATION OF AREA OF ACTIVITY:
   A.    Restoration: Upon completion of the permittee's activity, the general manager, at his option, may require the permittee to restore that portion of the district facilities damaged by the permittee's activity, or the general manager may elect to do such restoration himself, at permittee's cost.
   B.    Pavement: Where the pavement or surface has been removed, the permittee shall replace it to a thickness one inch (1") greater than that of the surrounding pavement or surface, but, in no event, to a thickness less than three inches (3").
   C.    Base Course: The base course removed shall be replaced to the same thickness as that of the surrounding base course.
   D.    Seal; Slurry: When the street surface has been treated with a seal or slurry prior to the work under permit, the seal and/or slurry shall be replaced upon the portion repaired.
   E.    Replacement Of Sections: When the structural section removed varies from (or exceeds) the average existing section, the general manager may elect to require the replacement of an equivalent section which would meet the average structural section requirements. (Ord. 09-230, 1-8-2009)