1007.12  MAINTENANCE AND FINAL INSPECTION APPROVAL.
   To receive final inspection and acceptance of any project, or portion thereof, the following must be completed by the applicant and provided to the City:
   (a)   Final stabilization must be achieved and all permanent SCMs must be installed and made functional, as determined by the Engineer and per the approved Comprehensive Stormwater Management Plan. Permittees are responsible for assuring all post-construction practices meet plan specifications and intended post-construction conditions have been met (e.g., sediment removed from, and sediment storage restored to, permanent pools, sediment control outlets removed and replaced with permanent post-construction discharge structures, and all slopes and drainageways permanently stabilized), but are not responsible under this permit for operation and maintenance of post-construction practices once coverage under this permit is terminated.
   (b)   An As-Built Certification, including As-Built Survey and Inspection, must be sealed, signed and dated by a Professional Engineer and a Professional Surveyor with a statement certifying that the stormwater control measures, as designed and installed, meet the requirements of the Comprehensive Stormwater Management Plan approved by the Engineer. In evaluating this certification, the Engineer may require the submission of a new set of stormwater practice calculations if he/she determines that the design was altered significantly from the approved Comprehensive Stormwater Management Plan.  The As-Built Survey must provide the location, dimensions, and bearing of such practices and include the entity responsible for long-term maintenance as detailed in the Inspection and Maintenance Agreement.
   (c)   A copy of the complete and recorded Inspection and Maintenance Plan and Inspection and Maintenance Agreement as specified in Section 1007.08 must be provided to the City.
   A post-construction/transition meeting must be held with the City, property owner, project engineer, contractor, and staff in charge of maintenance of the stormwater control measure (SCM) to discuss design, construction, long-term operation and maintenance and annual inspections/reports for the community after SCM is constructed and before a notice of termination (NOT) is submitted.  (Ord.  2020-59.  Passed 4-20-20.)