1108.09  UTILITIES IN SUBDIVISIONS OF MORE THAN FIVE SUBLOTS.
   In all subdivisions of more than five (5) sublots, the following procedure shall be followed and the following requirements shall be met:
   (a)    The preliminary Site Development Plan with respect to any new subdivision shall be submitted to all utility companies serving the subdivision as well as the Building Commissioner and Engineer, for their recommendations.
   (b)    Utility easements at least ten feet (10') in width for gas, telephone, electric power and street lighting distribution lines and facilities shall be provided on all front lot lines and along certain side or rear lot lines where necessary.
   (c)    Prior to granting final approval, the subdivider shall have installed or shall have furnished adequate bond for the ultimate installation in accordance with electrical requirements and the Building Code of the City of the following:
      (1)    Underground telephone cables;
      (2)   Underground distribution cables for power and street lighting from a common distribution system, and the equipment and housing necessary in the operation of the distribution system;
      (3)    Adequate provision for street light lamps and standards in accordance with a design approved by Council;
      (4)    Underground gas lines; and
      (5)   Underground television, internet, and other cables or fiber optic lines.
         (Ord. 2018-94.  Passed 10-21-19.)