919.02  PERMIT APPLICATION.
   The application for a permit for a temporary propane gas installation and connection shall be in writing, signed by the applicant, shall state the location of the connection and the location of the installation and shall indicate compliance with all required zoning, building and fire regulations. Such application shall be promptly reviewed by the Building Commissioner and the Fire Inspector. (Ord. 1977-129. Passed 11-21-77.)