8-5-10: RIGHT OF ENTRY AND INSPECTION:
   A.   By submitting a construction stormwater plan application to the City, the applicant hereby consents and authorizes the City and their authorized representatives, upon presentation of credentials to:
      1.   Enter upon the permitted site for the purpose of obtaining information, examination of records, and conducting investigations or surveys;
      2.   Bring such equipment upon the permitted development as is necessary to conduct such surveys and investigations;
      3.   Examine and copy any books, papers, records, or memoranda pertaining to activities or records required to be kept under the terms and conditions of this chapter; and
      4.   Inspect the stormwater pollution control measures and BMPs. (Ord. 2017-012, 11-21-2017)