§ 54.24 TESTS OR FINAL PIPING INSPECTION.
   Tests or final piping inspection shall be made by the gas fitter after all piping authorized by the permit has been installed and after all portions which are to be concealed by plaster or otherwise have been installed but before being concealed and before any fixture or gas appliances have been attached. This inspection shall include a pressure test at which time the piping shall stand an air pressure of ten pounds per square inch for a period of at least 15 minutes without any perceptible drop in pressure. All tools, apparatus, labor, and assistance necessary for the test shall be furnished by the permittee.
(Ord. passed 12-13-2016)