9-1-3: BUILDING PERMIT AND PLAN REVIEW FEES:
   A.   Payment Of Fees: All submittal fees and permit fees for flat rate projects shall be paid at the time of submittal of the permit application and plans and will be credited to the permit fee. The portion of the fee calculated from square footage, estimated cost, and other unit measures, shall be paid prior to issuance of a permit. Additional fees and reimbursements that are incurred after issuance of a permit shall be paid prior to issuance of a certificate of occupancy. All fees are nonrefundable. (Ord. 09-22, 6-1-2009)
   B.   Fee Schedule:
Permit Type
Fee
Permit Type
Fee
Accessory structures:
 
 
Deck, gazebo, porch
   $110.00
 
Garage 120 sq. ft.:
 
 
Preengineered
   125.00
 
 
Custom
   150.00
 
Pergola
   85.00
 
Shed <120 sq. ft.
   85.00
 
Trellis
   85.00
Commercial/industrial:
 
 
New construction:
 
 
 
Minor (<10,000 sq. ft.)
Submittal fee = $300.00
 
 
 
$19.00/100 sq. ft.
 
 
Major (10,000 sq. ft.):
Submittal fee = $1,000.00
 
 
 
$19.00/100 sq. ft.
 
 
 
First 10,000 sq. ft., $15.00/100 sq. ft.
 
 
 
Second 10,000 sq. ft., $12.00/100 sq. ft. remainder
 
Addition:
Submittal fee = $300.00
 
$19.00/100 sq. ft.
 
 
 
First 10,000 sq. ft., $15.00/100 sq. ft.
 
 
 
Second 10,000 sq. ft., $12.00/100 sq. ft. remainder
 
Tenant improvement
$32.00 first $1,000.00
 
$11.00 each additional $1,000.00
 
Other alterations
$32.00 first $1,000.00
 
$11.00 each additional $1,000.00
Other fees:
 
 
Construction water usage
Buildings <10,000 sq. ft. = $25.00
 
Buildings 10,000 sq. ft. = $50.00
 
Grading survey inspection
$75.00/inspection
 
Permit extensions
50 percent of original
 
Permits issued after work started
Permit fee plus 100 percent
 
Plumbing inspections
Actual cost plus $30.00
 
Reinspections
$75.00 first reinspect (each subsequent reinspect for same items is 2 times previous fee)
 
Temporary CO:
 
 
 
Residential
   $ 80.00
 
 
Commercial/industrial
   160.00
 
 
Extension >6 months
2 times original fee
Over the counter:
 
 
A/C condenser (replace only)
   $ 30.00 1
 
Boiler (replace only)
   45.001
 
Furnace (replace only)
   45.001
 
Furnace and A/C combination (replace only)
   45.001
 
Reroof
   40.00
 
Siding
   30.00
 
Water heater (replace only)
   60.001
Miscellaneous:
 
Demolition:
 
 
Large (commercial, industrial)
   300.00
 
 
Medium (residential)
   150.00
 
 
Small (accessory)
   55.00
 
Doors (exterior)
   55.00
 
Electric:
 
 
Other electric only work
   85.00
 
 
Service upgrade
   55.00
 
Fence
   75.00
 
Fireplace:
 
 
Masonry
   100.00
 
 
Prefabricated
   85.00
 
Irrigation
   55.00
 
Mechanical systems:
 
 
Ductwork replacement
   55.001
 
 
New system
   85.001
 
Parking lots:
 
 
New
   125.00
 
 
Resurface
   85.00
 
Plumbing only work
   85.00
 
Signs:
 
 
Monument/tower
   125.00
 
 
Portable
   25.00
 
 
Temporary
   55.00
 
 
Wall
   75.00
 
Temporary structures:
 
 
Commercial/industrial
   55.00
 
 
Residential
   55.00
 
Windows
   55.00
Plan review:
 
 
Commercial/industrial:
 
 
 
New construction
ICC plan examination fee plus 10 percent
 
 
Additions
ICC plan examination fee plus 10 percent
 
 
Alterations
Included in permit fee
 
Plumbing plan reviews
Actual cost plus $30.00
 
Residential:
 
 
 
New construction
Included in permit fee
 
 
Additions
Included in permit fee
 
 
Alterations
Included in permit fee
 
Additional plan review/revisions
   $ 30.00/1/2 hour
Pool/spa:
 
Pool:
 
 
Aboveground
   100.00
 
 
Inground
   150.00
 
Spa:
 
 
Inground
   125.00
 
 
Portable
   85.00
Residential:
 
 
New construction:
 
 
 
Single-family
Submittal fee = $100.00
 
 
 
$21.00/100 sq. ft., $400.00 min.
 
 
Attached (duplex)
Submittal fee = $100.00
 
 
 
$21.00/100 sq. ft., $400.00 min.
 
 
Multi-family (townhouse, apartment)
Submittal fee = $300.00
 
 
 
$21.00/100 sq. ft., $400.00 min.
 
Addition
Submittal fee = $100.00
 
$21.00/100 sq. ft.
 
Kitchen/bath remodel
$32.00 first $1,000.00
 
$11.00 each additional $1,000.00
 
Basement finish
$32.00 first $1,000.00
 
$11.00 each additional $1,000.00
 
Other alterations
$32.00 first $1,000.00
 
$11.00 each additional $1,000.00
 
Note:
   1.   These fees shall be effective June 1, 2010.
(Ord. 09-19, 6-1-2009; amd. Ord. 09-22, 6-1-2009; Ord. 10-27, 8-16-2010)