A. Payment Of Fees: All submittal fees and permit fees for flat rate projects shall be paid at the time of submittal of the permit application and plans and will be credited to the permit fee. The portion of the fee calculated from square footage, estimated cost, and other unit measures, shall be paid prior to issuance of a permit. Additional fees and reimbursements that are incurred after issuance of a permit shall be paid prior to issuance of a certificate of occupancy. All fees are nonrefundable. (Ord. 09-22, 6-1-2009)
B. Fee Schedule:
Permit Type | Fee |
Permit Type | Fee | ||
Accessory structures: | |||
Deck, gazebo, porch | $110.00 | ||
Garage 120 sq. ft.: | |||
Preengineered | 125.00 | ||
Custom | 150.00 | ||
Pergola | 85.00 | ||
Shed <120 sq. ft. | 85.00 | ||
Trellis | 85.00 | ||
Commercial/industrial: | |||
New construction: | |||
Minor (<10,000 sq. ft.) | Submittal fee = $300.00 | ||
$19.00/100 sq. ft. | |||
Major (10,000 sq. ft.): | Submittal fee = $1,000.00 | ||
$19.00/100 sq. ft. | |||
First 10,000 sq. ft., $15.00/100 sq. ft. | |||
Second 10,000 sq. ft., $12.00/100 sq. ft. remainder | |||
Addition: | Submittal fee = $300.00 | ||
$19.00/100 sq. ft. | |||
First 10,000 sq. ft., $15.00/100 sq. ft. | |||
Second 10,000 sq. ft., $12.00/100 sq. ft. remainder | |||
Tenant improvement | $32.00 first $1,000.00 | ||
$11.00 each additional $1,000.00 | |||
Other alterations | $32.00 first $1,000.00 | ||
$11.00 each additional $1,000.00 | |||
Other fees: | |||
Construction water usage | Buildings <10,000 sq. ft. = $25.00 | ||
Buildings 10,000 sq. ft. = $50.00 | |||
Grading survey inspection | $75.00/inspection | ||
Permit extensions | 50 percent of original | ||
Permits issued after work started | Permit fee plus 100 percent | ||
Plumbing inspections | Actual cost plus $30.00 | ||
Reinspections | $75.00 first reinspect (each subsequent reinspect for same items is 2 times previous fee) | ||
Temporary CO: | |||
Residential | $ 80.00 | ||
Commercial/industrial | 160.00 | ||
Extension >6 months | 2 times original fee | ||
Over the counter: | |||
A/C condenser (replace only) | $ 30.00
1 | ||
Boiler (replace only) | 45.001 | ||
Furnace (replace only) | 45.001 | ||
Furnace and A/C combination (replace only) | 45.001 | ||
Reroof | 40.00 | ||
Siding | 30.00 | ||
Water heater (replace only) | 60.001 | ||
Miscellaneous: | |||
Demolition: | |||
Large (commercial, industrial) | 300.00 | ||
Medium (residential) | 150.00 | ||
Small (accessory) | 55.00 | ||
Doors (exterior) | 55.00 | ||
Electric: | |||
Other electric only work | 85.00 | ||
Service upgrade | 55.00 | ||
Fence | 75.00 | ||
Fireplace: | |||
Masonry | 100.00 | ||
Prefabricated | 85.00 | ||
Irrigation | 55.00 | ||
Mechanical systems: | |||
Ductwork replacement | 55.001 | ||
New system | 85.001 | ||
Parking lots: | |||
New | 125.00 | ||
Resurface | 85.00 | ||
Plumbing only work | 85.00 | ||
Signs: | |||
Monument/tower | 125.00 | ||
Portable | 25.00 | ||
Temporary | 55.00 | ||
Wall | 75.00 | ||
Temporary structures: | |||
Commercial/industrial | 55.00 | ||
Residential | 55.00 | ||
Windows | 55.00 | ||
Plan review: | |||
Commercial/industrial: | |||
New construction | ICC plan examination fee plus 10 percent | ||
Additions | ICC plan examination fee plus 10 percent | ||
Alterations | Included in permit fee | ||
Plumbing plan reviews | Actual cost plus $30.00 | ||
Residential: | |||
New construction | Included in permit fee | ||
Additions | Included in permit fee | ||
Alterations | Included in permit fee | ||
Additional plan review/revisions | $ 30.00/1/2 hour | ||
Pool/spa: | |||
Pool: | |||
Aboveground | 100.00 | ||
Inground | 150.00 | ||
Spa: | |||
Inground | 125.00 | ||
Portable | 85.00 | ||
Residential: | |||
New construction: | |||
Single-family | Submittal fee = $100.00 | ||
$21.00/100 sq. ft., $400.00 min. | |||
Attached (duplex) | Submittal fee = $100.00 | ||
$21.00/100 sq. ft., $400.00 min. | |||
Multi-family (townhouse, apartment) | Submittal fee = $300.00 | ||
$21.00/100 sq. ft., $400.00 min. | |||
Addition | Submittal fee = $100.00 | ||
$21.00/100 sq. ft. | |||
Kitchen/bath remodel | $32.00 first $1,000.00 | ||
$11.00 each additional $1,000.00 | |||
Basement finish | $32.00 first $1,000.00 | ||
$11.00 each additional $1,000.00 | |||
Other alterations | $32.00 first $1,000.00 | ||
$11.00 each additional $1,000.00 | |||
Note:
1. These fees shall be effective June 1, 2010.
(Ord. 09-19, 6-1-2009; amd. Ord. 09-22, 6-1-2009; Ord. 10-27, 8-16-2010)