(A) New, construction for multi-family structures, commercial structures or industrial structures. Minimum fee is $200, plus $0.07 per square foot of gross floor area, including attached garage or carport and the area of the basement with a maximum permit fee of $6,000 (this fee includes all required permits).
(B) Additions or remodeling. Minimum fee is $100, plus $0.07 per square foot of gross floor area including attached garage or carport and the area of the basement.
(C) Accessory structure. Minimum fee is $100, plus $0.07 per square foot of gross floor area.
(D) Relocation. Minimum fee is $100, plus $0.07 per square foot of gross floor area.
(E) Demolition. Minimum fee is $30.
(F) Swimming pool. Minimum fee is $60.
(G) Under ground or above ground storage tanks. Minimum fee is $60.
(H) Electrical permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(I) Plumbing permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(J) Heating permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(K) Ventilation permit. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(L) Air conditioning permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(M) Heating and air conditioning combination permit. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(N) Sprinkler; permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(O) Hood permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(P) Fire suppression system permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(Q) Sign permit only. Minimum fee is $30 for first inspection, plus $30 for each additional inspection.
(R) Re-inspection fee. Minimum fee is $30 per inspection.
(S) Foundation, permit. Minimum fee is $60.
(T) Cellular towers and control buildings. Minimum fee is $60.
(U) Permit renewal for one year (original permit good for two years). Minimum fee is 50% of original fee.
(Ord. 1999-12, passed 11-29-1999)