6-3-8: COMPLIANCE MONITORING:
   A.   The city requires that monitoring facilities be provided and operated at the user's expense, to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility shall normally be situated on the user's premises, but the Town, after consultation with the city, may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will be accessible by the city/Town.
   B.   There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user.
   C.   Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with all applicable local construction standards and specifications. Construction shall be completed within ninety (90) days following written notification by the Town. (Ord. 99-03, 11-16-1999)