§ 1606.02 ACCEPTANCE TEST/INSPECTION FEES.
   (A)   Underground water supply (NFPA 24) (certification required).
      (1)   Test/inspection of underground pipe: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (B)   Sprinkler and standpipe system acceptance test.
      (1)   Test/inspection fee: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (C)   Fire pump acceptance test.
      (1)   Test/inspection fee: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (D)   Fire detection system/fire alarm acceptance test.
      (1)   Test/inspection fee: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (E)   Hood and duct system acceptance test.
      (1)   Test/inspection fee: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (F)   Carbon dioxide, halon, dry chemical, foam or other wet chemical suppression system acceptance test.
      (1)   Test/inspection fee: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (G)   Performance. The performance of any type of acceptance test not listed above shall be subject to the following fee schedule:
      (1)   Test/inspection fee: $50;
      (2)   Re-tests/inspection: $75 each; and
      (3)   Subsequent re-test/inspection increase in increments of: $25.
   (H)   Licensure. Installer of all fire systems must be licensed by the state.
(Prior Code, § 1606.02) (Ord. 116-2003, passed 9-8-2003)