§ 153.110 OFF-SITE CONSTRUCTION FACILITIES (ACCESSORY).
   (A)   Accessory construction facilities shall be permitted to establish an operations base in any zoning district upon obtaining a special exception after it is ascertained that such construction facilities are incidental to and necessary for such construction or installation within a three-mile radius of the operations base.
   (B)   Each such permit shall specify the location of the proposed facility and define the area and boundaries thereon to be served. The permit shall be granted for not more than one year and upon proper application, be extended a similar period of time for the same site. Upon termination of the permit, all materials used in the construction or installation shall be removed from the premises.
   (C)   Ingress and egress from such facilities shall be only from major arterials or collector streets which give rise to the least traffic through residential areas.
   (D)   Included in accessory construction facilities are temporary batching plants for asphaltic or Portland cement concrete, temporary buildings or mobile shells, field storage of materials and/or equipment.
(Ord. 20-8, passed 12-7-2000; Ord. 07-09, passed 8-6-2007)