The following permit fees and inspection fees shall be paid by the applicant upon issuance of a permit:
Type | Fee |
(a) RCO Occupancies. | |
(1) New construction: | *Subject to change every six months Check with the Building Department for current number |
A. Engineering and grading fee/deposit | |
1. Site plan fee | $100.00 |
2. Foundation grade check fee | $150.00 |
3. Final grade inspection fee | $170.00 |
4. Engineered and grade deposit | $300.00 |
5. Erosion control inspection fee | $375.00 |
B. Fee per dwelling unit Up to 3 (with or without attached garage) (Blanket permit includes all mechanicals) | Square foot construction cost example: (110.95)* x PFM (.006) x GA |
Fee | |
C. Accessory building Detached garage, barn or shed (400 sq. ft. or larger) | Square foot construction cost example: (110.95)* x PFM (.006) x GA |
D. Additions and attached garages Blanket permit includes all mechanicals | Square foot construction cost example: (100.95)* x PFM (.006) x GA |
E. Alterations to existing structure Includes finished basement | $0.45 per square foot |
(2) Lawn sprinkler: | $35.00 minimum, plus $0.50 per sprinkler head |
(3) All minor repairs to one, two and three family dwellings where this Building Code does not require plans to be submitted for review | $60.00 per dwelling unit (fixed) |
(4) Wrecking, demolition or razing: | |
A. Fee per dwelling unit | |
Up to 3 (with or without attached garage) | $100.00 |
B. All accessory and/or appurtenant structures | $35.00 |
(5) Moving of structures: | |
A. Fee per dwelling unit | |
Up to 3 (with or without attached garage) | $100.00 |
B. All accessory and/or appurtenant structures | $25.00 |
(6) Decks: | $60.00 |
(7) Patios: | $60.00 |
(8) Gazebos: | $60.00 |
(9) Pergolas: | $60.00 |
(10) Sidewalks: | $50.00 |
(11) Driveways (asphalt or concrete): | $75.00 |
(12) Roof over deck or patio: | $60.00 |
(13) Sheds over 200 sq. ft. up to 400 sq. ft.: | $75.00 |
(14) Basement waterproofing: | $40.00 per wall |
(15) Re-roof: | $60.00 |
(16) Private swimming pools: | |
A. Above ground | $75.00 (includes electric) |
B. In-ground | $100.00 (plus engineering, electric and mechanical fees) |
Note: A $25.00 fee for a certificate of use and occupancy permit may be required for some of the above permits per Section 1442.10
. An additional fee of 1% of the total permit fee for the State of Ohio Board of Building Standards will be added to all approved residential building permits per Section 1442.08
. Also note, sewer, water, and park fees, where applicable, will be added to permit fees. | |
(b) OBC (Commercial) Occupancies: | |
(1) New construction and additions: | |
A. New construction and additions (Includes multi-family and new construction with a single tenant) | $175.00 minimum, plus standard fee of (PFM square foot construction cost x PFM X GA (includes all electrical and mechanical fees) |
B. New construction shell with multiple tenants | Square foot construction cost x PFM x GA x 50% + $175.00 (includes all electrical and mechanical fees) |
C. New tenant build-out (Includes all electrical and mechanical fees) | Square foot construction cost x PFM x GA x 50% +$175.00 |
D. Alterations (existing space) | $175.00 + $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: | |
All minor repairs to any OBC use group occupancy where the OBC does not require plans to be submitted for review | $100.00 (fixed) |
(3) Wrecking, demolition or razing: | $125.00 minimum |
(4) Moving of structures: | $100.00 |
Fee | |
(5) Concrete/asphalt drives, parking areas and parking lots: | |
A. Up to 15,000 sq. ft. | $85.00 minimum |
B. Over 15,000 sq. ft. | $85.00, plus $5.00 per each additional 5,000 sq. ft. over 15,000 sq. ft. |
(6) Sidewalks: | $50.00 |
A. No fee for sidewalk required to be installed by property owner per Section 1246.05(a)(4) and (5) | |
(7) Private swimming pools (See Section 1478.02): | |
(8) Signs: | |
For all illuminated or nonilluminated signs | |
A. 1 to 25 sq. ft. | $15.00 + $0.50 per sq. ft. per face |
B. 26 to 100 sq. ft. | $25.00 + $0.50 per sq. ft. per face |
C. Over 100 sq. ft. | $50.00 + $0.50 per sq. ft. per face |
(9) Culvert installation: | |
Roadside ditch coverings, culverts (min. 12 in. diameter by 20 ft. in length) | Owner to pay cost of materials and City will install |
(10) Field inspection of existing buildings and structures: For compliance with the applicable building codes, when requested by the owner or the owner's agent | $50.00 per inspection |
(11) Fire suppression: | |
A. Sprinkler systems | $150.00 + $2.00/ head |
B. Hood suppression system | $125.00 |
(c) Change in Original Plans. When revised plans are submitted after an original building permit has been issued, an additional fee will be charged for all additional permit requirements as set forth in this section. No reduction in the original permit fee shall be made when revised plans indicate revisions of a nature which would have a lower cost than the original building permit fee.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10. Passed 12-20-10; Ord. 8-11. Passed 1-24-11; Ord. 35-11. Passed 4-25-11; Ord. 123-11. Passed 12-27-11; Ord. 82-12. Passed 7-9-12; Ord. 111-12. Passed 10-1-12; Ord. 80-14. Passed 7-14-14; Ord. 43-23. Passed 3-37-23.)
The following permit fees and inspection fees shall be paid by an applicant upon issuance of a permit:
Type | Fee |
(a) RCO (Residential) Occupancies. | |
(1) Alterations: | $60.00 + GA x $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: All minor repairs to one, two and three family dwellings and all accessory and/or appurtenant structures where the building code does not require plans to be submitted for review such as: temp service; service upgrade; additional outlets; additional circuits | $60.00 |
(b) OBC (Commercial) Occupancies. | |
(1) Alterations: | $175.00 + $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: | $85.00 |
All minor repairs to any OBC use group occupancy where the OBC does not require plans to be submitted for review such as: temp service, service upgrade; additional circuits | |
(3) Fire alarm systems: | $150.00 + $2.00 per device |
(c) Electrical Signs. In addition to the required building permit fee, a sign requiring an electrical connection for illumination shall require an electrical permit at the rate of thirty-five dollars ($35.00).
(d) Miscellaneous Electrical Permit Fees. Inspections of carnivals, bazaars, service reconnections and temporary electrical installations shall require a fee at the rate of forty-five dollars ($45.00) per inspection.
(e) Other Fees. A fee shall be charged for the inspection of any electrical equipment for safety and compliance with applicable code requirements when requested by an owner or the owner's agent at the rate of forty-five dollars ($45.00) per inspection.
(f) Change in Original Plans. When revised electrical plans are submitted after an original electrical permit has been issued, an additional fee will be charged for any electrical equipment pursuant to this fee schedule. No reduction in the original permit fee shall be made for revisions which would result in a lower fee than the original permit fee.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10.Passed 12-20-10; Ord. 43-23. Passed 3-27-23.)
The following permit fees and inspection fees shall be paid by an applicant upon issuance of a permit:
Type | Fee |
(a) RCO (Residential) Occupancies. | |
(1) Alterations: | $60.00 + GA x $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: | |
All minor repairs to one, two and three family dwellings where this Building Code does not require plans to be submitted for review such as: replacement hot water tank adding new drains, vents, water lines or plumbing appliances | $60.00 |
(b) OBC (Commercial) Occupancies. | |
(1) Alterations: | $175.00 + $5.00/100 sq. ft. |
(2) Minor repairs and minor construction where no plans are required: | $85.00 |
All minor repairs to any OBC use group occupancy where the OBC does not require plans to be submitted for review such as: replacement hot water tank; replacement footer tile and/or downspouts; waterproofing | |
Fee | |
(3) Underground storage tank: | $100.00 per tank, plus $1.00 per 1,000 gal. capacity |
(4) Above-ground storage tanks; building and fire services: | $75.00 per tank, plus $1.00 per 1,000 gal. capacity |
(5) Lawn sprinklers: | $35.00 minimum, plus $0.50 per sprinkler head |
(c) Other Fees. A fee shall be charged for the inspection of any plumbing equipment for safety and compliance with applicable code requirements when requested by an owner or the owner's agent at the rate of forty-five dollars ($45.00) per inspection.
(d) Change in Original Plans. When revised plumbing plans are submitted after an original plumbing permit has been issued, an additional fee will be charged for any plumbing equipment pursuant to this fee schedule. No reduction in the original permit fee shall be made for revisions which would result in a lower fee than the original permit fee.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10. Passed 12-20-10; Ord. 43-23. Passed 3-27-23.)
The following permit fees and inspection fees shall be paid by an applicant upon issuance of a permit:
Type | Fee |
(a) RCO (Residential) Occupancies. | |
(1) Alterations: | $60.00 + GA x $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: | |
All minor repairs to one, two and three family dwellings where this Building Code does not require plans to be submitted for review such as: replacement furnace and/or replacement air conditioning; duct work | $60.00 |
(b) OBC (Commercial) Occupancies. | |
(1) Alterations: | $175.00 + $5.00/100 sq. ft. |
(2) Minor repairs where no plans are required: | |
Type | Fee |
All minor repairs to any OBC use group occupancy where the OBC does not require plans to be submitted for review such as: replacement furnace and/or replacement air conditioning; replacement roof top units; duct work | $85.00 |
(3) Kitchen hood: | $100.00 |
(c) Other Fees. A fee shall be charged for the inspection of any HVAC equipment for safety and compliance with applicable code requirements when requested by an owner or the owner's agent at the rate of forty-five dollars ($45.00) per inspection.
(d) Change in Original Plans. When revised HVAC plans are submitted after an original HVAC permit has been issued, an additional fee will be charged for any HVAC equipment pursuant to this fee schedule. No reduction in the original permit fee shall be made for revisions which would result in a lower fee than the original permit fee.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10. Passed 12-20-10; Ord. 43-23. Passed 3-27-23.)
(a) RCO Occupancies. In addition to the fees set forth in this chapter, the Chief Building Official shall collect, on behalf of the Board of Building Standards of the Department of Industrial Relations of the State, a fee, equal to 1% of those fees imposed for permits, the acceptance and approval of plans and specifications, and for the making of inspections pursuant to O.A.C. 4101:8-1-03, Residential Code of Ohio.
(b) OBC (Commercial) Occupancies. In addition to the fees set forth in this chapter, the Chief Building Official shall collect, on behalf of the Board of Building Standards of the Department of Industrial Relations of the State, a fee, equal to 3% of those fees imposed for permits, the acceptance and approval of plans and specifications, and for the making of inspections pursuant to O.A.C. 4101:1-1-03.
(c) When an inspection is required and scheduled, and the work is found to be either incomplete or not in compliance with the applicable building code(s), or at variance with the approved plans and specifications, a charge for each reinspection required to verify compliance shall be made at the rate of one hundred twenty-five dollars ($125.00) per inspection.
(d) The fee required for review, approval and inspection regarding any alteration or change of drainage and watercourses shall be one hundred fifty dollars ($150.00).
(e) All other fees required in these Codified Ordinances shall be charged as set out therein.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10.Passed 12-20-10; Ord. 121-15. Passed 9-14-15; Ord. 43-23. Passed 3-27-23.)
(a) Deposit Requirement. In addition to the fees set forth in this chapter, every owner or building permit applicant, whether an individual, corporation or partnership, erecting or having erected a building in the Municipality, at the time of permit issuance, shall post a procedural compliance deposit as hereinafter set forth to guarantee the satisfactory performance of all of the permit holder's procedural obligations required by the City and this Building Code in the construction and erection of the building and the site which is the subject of a building permit.
(b) Deposit Amount. For each RCO occupancy and for each OBC use group occupancy, the following deposits are required:
$00.00 to $250,000.00 | Deposit amount: $1,500.00 |
$250,001.00 to $500,000.00 | Deposit amount: $3,500.00 |
$500,001.00 to $1,000,000.00 | Deposit amount: $6,500.00 |
$1,000,001.00 and up | Deposit amount: $10,000.00 |
These deposits will be configured from the current ICC (International Code Council) Building Valuation Data Tables, which are published every six months by the ICC.
(c) Deposit Form. The deposit required by this section shall be posted with the City in cash at the time of the issuance of the permit.
(d) Forfeiture of Deposit. All or a portion of the deposit shall be forfeited into the general fund if one or more of the following conditions occur:
(1) Such building or structure is not completed within two years from the date of the issuance of the permit;
(2) Such building or structure is occupied without authorization prior to the issuance of a certificate of use and occupancy;
(3) All required inspections under this Building Code have not been requested or permitted; or
(4) Any other procedural obligation of the permit holder established by law is not met.
(e) Return of Deposit. The deposit shall be returned to the permit holder upon satisfactory performance of all procedures required by this Building Code applicable to the project.
(f) Time Extensions. If the execution and completion of the building or structure or any of its site amenities within the time frame set forth in division (d) of this section is unavoidable and found to be justified by the Chief Building Official, the partial or full forfeiture of the deposit may be waived and the original deposit may stand until full execution and completion of the project, within a reasonable time as determined by the Chief Building Official.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10. Passed 12-20-10; Ord. 136-12. Passed 12-10-12; Ord. 43-23. Passed 3-27-23.)