The following permit fees and inspection fees shall be paid by an applicant upon issuance of a permit:
Type | Fee |
(a) RCO (Residential) Occupancies. | |
(1) Alterations: | $60.00 + GA x $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: All minor repairs to one, two and three family dwellings and all accessory and/or appurtenant structures where the building code does not require plans to be submitted for review such as: temp service; service upgrade; additional outlets; additional circuits | $60.00 |
(b) OBC (Commercial) Occupancies. | |
(1) Alterations: | $175.00 + $5.00/100 sq. ft. |
(2) Minor repairs and miscellaneous construction where no plans are required: | $85.00 |
All minor repairs to any OBC use group occupancy where the OBC does not require plans to be submitted for review such as: temp service, service upgrade; additional circuits | |
(3) Fire alarm systems: | $150.00 + $2.00 per device |
(c) Electrical Signs. In addition to the required building permit fee, a sign requiring an electrical connection for illumination shall require an electrical permit at the rate of thirty-five dollars ($35.00).
(d) Miscellaneous Electrical Permit Fees. Inspections of carnivals, bazaars, service reconnections and temporary electrical installations shall require a fee at the rate of forty-five dollars ($45.00) per inspection.
(e) Other Fees. A fee shall be charged for the inspection of any electrical equipment for safety and compliance with applicable code requirements when requested by an owner or the owner's agent at the rate of forty-five dollars ($45.00) per inspection.
(f) Change in Original Plans. When revised electrical plans are submitted after an original electrical permit has been issued, an additional fee will be charged for any electrical equipment pursuant to this fee schedule. No reduction in the original permit fee shall be made for revisions which would result in a lower fee than the original permit fee.
(Ord. 12-99. Passed 3-8-99; Ord. 40-08. Passed 5-12-08; Ord. 111-10.Passed 12-20-10; Ord. 43-23. Passed 3-27-23.)