Any person drilling or operating a well for oil or gas, or cleaning an abandoned well in preparation for plugging, shall provide a drilling in control gate which shall be constructed to cut off the flow of gas to the top of the well and which can be operated from a point remote from the well.
(Ord. 221-65. Passed 6-9-65.)