Skip to code content (skip section selection)
Compare to:
1222.05  UTILITIES.
   All utilities which are to be located under the pavement shall be installed before the pavement is laid. All electric and telephone service lines shall be located underground wherever possible. If the service lines cannot be located underground they shall be located at the rear of the lots. If electric. telephone, gas and CATV lines are installed underground, the 12-inch utility easement shall be provided along the front of all lots.
(Ord. 52-99.  Passed 3-22-99; Ord. 94-03.  Passed 4-28-03.)