§ 92.05  TIME OF COMPLETION.
   (A)   The holder of any permit issued which grants permission to cut, dig, trench, grade, excavate, tunnel, or bore, in or under any road, street, alley, sidewalk, curb, roadside ditch, right-of-way, or other public place, as provided in this subchapter, shall complete all work including pavement repairs within 14 calendar days after beginning work at each location on any street which is classified as a primary arterial, secondary arterial, one-way arterial, or collector, and within 60 calendar days after beginning work on all local streets and alleys. The permittee shall be responsible for making and maintaining the temporary repairs to the satisfaction of the city until the permanent repairs are completed.
   (B)   For any excavations made during the period from November 15 through March 15 of each year, if weather conditions do not allow permanent repairs to be completed, the permittee shall make temporary pavement repairs. Said temporary repairs shall be made with asphalt cold mix and shall be maintained by the permittee until permanent repairs can be made. Permanent repairs shall be completed prior to the following April 15. All excavations made prior to November 15 shall have permanent repairs completed by November 15 of the same year.
(Ord. 2012-01, passed 3-12-2012)  Penalty, see § 92.99