§ 52.37  FLOOD WATERS.
   New and replacement sewer systems shall be constructed to eliminate or minimize infiltration by, or discharge into, flood waters. Moreover, on-site waste disposal systems will be designed to avoid impairment or contamination during flooding.
(1998 Code, § 3-219)