The Planning Commission designee shall determine the appropriate subdivision procedure for modifying an existing, recorded subdivision plat based on the following criteria:
(A) Any replat of a subdivision that creates the same or less of an impact to any platted public rights-of-way or that does not increase the density of buildable lots, shall be permitted through the secondary plat or certified survey procedure.
(B) Any replat that significantly alters the public right-of-way or increases the number of buildable lots shall be required to follow the minor or major division review procedure. An improvement plan will be required if the replat results in construction changes to the subdivision and/or the public right-of-way.
(Ord. 2019-008, passed 5-13-19)