§ 53.067  PERMIT APPLICATION REQUIREMENTS.
   All industrial users shall submit the following information on the wastewater discharge permit application form supplied by the WWTP Superintendent in units and terms as determined necessary by the WWTP Superintendent to adequately evaluate the application, accompanied by payment of a permit application review fee:
   (A)   The name, address, and location of facility from which discharge will be made, including the names of the owner(s) and operator(s) of the facility.
   (B)   Whether the user is a corporation, partnership, proprietorship, or other type of entity, and the name of the person(s) responsible for discharges by the user.
   (C)   SIC code of both the industry (or use) as a whole and any processes for which categorical pretreatment standards have been promulgated.
   (D)   Wastewater constituents and characteristics, including, without limitation, any pollutants that are limited or regulated by any federal, state, or local standards or requirements. Sampling and analysis shall be performed in accordance with the procedures established by the U.S. EPA and contained in 40 C.F.R. part 136.
   (E)   Time and duration of discharges.
   (F)   Daily maximum and monthly average wastewater flow rates, including daily, monthly, and seasonal variations, if any. All flows shall be measured unless other variable techniques are approved by the WWTP Superintendent due to cost or nonfeasibility.
   (G)   Description of activities, facilities, and plant processes on the premises, including a list of all raw materials and chemicals used at the facility (including copies of material safety data sheets for all such materials and chemicals) that are, or could accidentally or intentionally be, discharged to the POTW.
   (H)   Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, floor drains, inspection manholes, sampling chambers and appurtenances by size, location and elevation.
   (I)   Each product produced by type, amount, process and rate of production.
   (J)   Type and amount of raw materials processed (average and maximum per day).
   (K)   Number and type of employees, hours of operation, and proposed or actual hours list of operation of the pretreatment system.
   (L)   A list of all environmental permits (and, if requested by the WWTP Superintendent, a copy of any environmental permit) held by the user applicable to the premises for which the wastewater discharge permit is being sought.
   (M)   Whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet all applicable federal, state and local pretreatment standards and requirements. If additional O&M or additional pretreatment will be required to meet the applicable standards and requirements, then the user shall indicate the shortest time schedule necessary to accomplish installation or adoption of the additional O&M and/or pretreatment. The completion date in this schedule shall not be longer than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule:
      (1)   The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (including, without limitation, hiring an engineer, completing preliminary plans, completing final plans, executing contracts for major components, commencing construction, completing construction, beginning operation, and conducting routine operation). No increment referred to above shall exceed nine months, nor shall the total compliance period exceed 18 months.
      (2)   No later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the WWTP Superintendent including, at a minimum, whether or not it complied with the increment of progress, the reason for any delay, and if appropriate, the steps being taken by the user to return to the established schedule. In no event shall more than nine months elapse between submission of the progress reports to the WWTP Superintendent.
   (N)   Any other information determined necessary by the WWTP Superintendent to adequately evaluate the application. To the extent that actual data is not available for a new source, the applicant shall supply estimated or expected information.
   (O)   All site plans, floor plans, or other plans required to be submitted as a part of the application shall be prepared and sealed by a licensed engineer.
   (P)   All applications shall be signed by an authorized representative of the user and certified as provided by § 53.100 below.
(Ord. 185, passed 4- -2006)